英文资料翻译--经济型节能系统在水泵方面的应用(编辑修改稿)内容摘要:
uildings by Usage Among air conditioningrelated technologies, we have focused on the control of air conditioning pumps and have developed a new energysaving control system called EconoPilot which meets the requirements for implementations mentioned earlier system. The EconoPilot adopts a new control mechanism contrived by three enterprisesYokogawa Electric Corporation, Asahi Kogyosha Co, Ltd., and The First Energy Service Company, Limitedand was mercialized by Yokogawa after the development and demonstration phases, through joint research with the New Energy and Industrial Technical Development Organization (NEDO). OVERVIEW OF AN AIR CONDITIONING SYSTEM Figure 2 shows an overview of an air conditioning system. Broadly speaking, energy is consumed by heat sources, water pumps, and ventilators. FIgure 2 Overview of an Air Conditioning System A heat source generates cold/hot water through gas bustion in the case of applying a gasbased cold/hot water generator, the cold/h。英文资料翻译--经济型节能系统在水泵方面的应用(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。