胰岛素给药途径研究进展外文翻译(编辑修改稿)内容摘要:
e fastest, followed by upper arms, thighs, buttocks. INS also absorbed dose levels and physical activity, the greater the dose, the higher the concentration, slower absorption and absorption rate of movement will increase. Abdominal area, there are advantages of subcutaneous injection, usually the abdomen of adulttype arrangement for rotation or subcutaneous injection, as two distance 2 cm, can be injected with 180 points [2], 3 times per day calculated for continuous injection 2 months later to the cycle. infusion Mainly applied to diabetic ketoacidosis, hyperosmolar nonketotic diabetic a, severe trauma, infection, surgical treatment of perioperative who use intravenous infusion of small doses of available INS. INS pump INS pump treatment of diabetes, can effectively simulate the conti nuing based on INS secretion and meal pulsed release, the INS infusion into the patient39。 s body to maintain blood levels of INS, shorten time to control high blood sugar and reduce the occurrence of low blood sugar, reduce Patients suffering multiple subcutaneous INS, INS pump is the best means of intensive therapy. intramuscular INS intramuscular absorption of fast, poor absorption by subcutaneous injection for, INS has a large amount of blood sugar can not control those who unconditionally infusion mild ketoacidosis INS patients. 2 INS administration of noninjecting means Local Administration For diabetic patients with diabetic foot ulcers or pressure sores [3] patients in the affected area when dealing with the INS bined with metronidazole, such as Fuyu anisodamine wounds, dressings opened the next day, showing significantly reduced secretion of shallow the site of rupture of small wounds, or 4 d 3 d scab healing。 deep muscle can gradually see the wound granulation, after 12 weeks of dressing, the wound healing scab. inhalation Relative to the absorption of peptide drugs, the lungs have more advantages, such as large alveolar surface area (50 m2 ~ 140 m2), very thin alveolar membrane, rich capillary work, and not the first highpermeability pass effect, narrow blood path, low activity, deep slow lung clearance rate, etc., these good physical environment for the absorption of peptide provided favorable conditions [4].In recent years, progressive pulmonary route of administration attention. INS inhalation require special technologies and facilities, mon technologies that are Techno sphere and AIR [5]. Most clinical trials show that in type 1 and type 2 diabetes patients, the inhaled and subcutaneous INS INS pared with the same safety and effectiveness, and more receptive to the patient [68]. INS agents present pelling pulmonary delivery, which people with diabetes will be a great blessing. Oral administration Route of administration of oral administration is the most convenient of all kind, patient pliance is best. However, INS, as a protein, the absorption in the gastrointestinal tract is difficult to overe the acid catalyzed deposition, protein degradation, and poor mucosal barrier peration, with the disadvantage o f low bioavailability, thereby improving the bioavailability of the drug is a pharmaceutical scientist Research has been the problem. Intraperitoneal administration Intraperitoneal administration is foreigndeveloped a device called a subcutaneous peritoneal entry device, it would be on the transplant at the。胰岛素给药途径研究进展外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。