绿色建筑毕业设计外文翻译-建筑结构(编辑修改稿)内容摘要:
pollutant emissions and other acts of tax efforts, improve the legal system of environmental protection, from the increase in government construction projects on the sustainability of economic support and raise the cost to the construction of polluting the environment acts as the costs for green buildings design and construction to create a favorable external environment. This goal is not entirely the responsibility of government agencies, as the architects involved in design work as a sound system of responsibility for remendations obligations, 6 because only the most from the practice of the need is real and urgent. The related policy issues in green building design strategies, building a system to solve the economic problems facing the important aspects. At the micro level, the current from the economic point of Design Strategy is more fully consider the economic operation of the project, and specific technical strategies accordingly adjusted. Ethical Significance. Green building rating system, the theoretical basis of the concept of sustainable development, therefore, whether the evaluation system of each country how much difference in structure, they all have one thing in mon: To reduce the burden of ecological environment, improve construction quality of the environment for future generations to remain the development of room. This radically changes the longsought human blindly to the natural attitude, reflecting people39。 s understanding of the relationship between man and nature by the opposition to the uniform change. According to the current global energy reserves and resources distribution, the Earth39。 s natural environment is also far from the edge of exhaustion, enough people enjoy the luxury of contemporary material life. But now we have to consume a resource, it means that future generations will be less of a living space. More importantly, if we consume the natural environment more than it can limit selfrenewal, then the future of the younger generation is facing the pla39。 s ecosystems can not recover the risk into a real crisis. Therefore we can say, the development of green buildings and their corresponding evaluation system, for more contemporary people is the responsibility and obligations. For more the interests of future generations and advantages for green building design. building design include the followings: Saving energy: full use of solar energy, using energyefficient building reducing heating and air conditioning use. Set according to the principle of natural ventilation cooling system that allows efficient use of building to the dominant wind direction in summer. 7 Adapted to local climatic conditions, building use form and general layout of the plane. Resource conservation: in the building design, construction and selection of construction materials, are considered fair use and disposal of resources. To reduce the use of resources, strive to make the use of renewable resources. Conserve water resources, including water conservation and greening. Return to Nature: Green Building exterior to emphasize integration with the surrounding environment, harmony, movement each other so that the protection of natural ecological environment. 5 .Effects of green building Effects of the position of green building Effects of green building, including internal effects and external effects, direct benefits and direct costs as the internal effect, known as the indirect benefits and indirect costs of external effects, according to engineering economics point of view: the internal effects can be financial evaluation, external effects should be economic evaluation, economic evaluation is based on the socalled rational allocation of scarce resources and socioeconomic principles of sustainable development, from the perspective of the overall national economy, study projects spending of social resources and contributions to the munity to evaluate the project39。 s economic and reasonable and external effects generally include industry effects, environmental and ecological effec。绿色建筑毕业设计外文翻译-建筑结构(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。