直流电动机外文翻译(编辑修改稿)内容摘要:

e role of all the disturbances, such as disturbances such as voltage, current loop by regulating the timely inhibited, so that speed is not affected or less affected by disturbances. Current speed of the inner ring also played in the transformation of the target structure and regulation of the role of parameters to accelerate the speed of adjustment in response to the process of ring. In characteristics, the speed of the adjustment ring to ensure the system without static error, the role of current loop system with better sag characteristics of an excavator. • 4. System Simulation MathWorks Inc. MATLAB is introduced in 1984 a set of numerical simulation software, is divided into the total package and a number of kits, you can achieve the numerical analysisDifferent branch of mathematics it to function in the form of algorithms classified as libraries, the use of direct calls to these functions and give the actual parameters of the problem can be solved quickly and accurately. that is, to a series of connecting module, a plex model of the system. In recent years, was the rise of the Simulink has bee a field of academic and industrial • Building, simulation and analysis of dynamic systems on the most widely used software package, it supports linear and nonlinear systems, could create a continuous time, di。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。