电气类毕业设计外文翻译---选择一个嵌入式的智能电机的控制器-电气类(编辑修改稿)内容摘要:

or to both regulate energy consumption and implement other functions to meet design requirements. Advanced DSPbased MCUs use advanced algorithm control to improve system performance and reduce system cost. These additional functions range from power factor correction to Ether drivers and TCP/IP protocol stacks. Depending on the application requirements, the system plexity ranges from the minimal dc brush motor controller to highend vector drives. For the simplest control systems, all that may be needed is a microcontroller (MCU) that offers the requisite motor control peripherals (see Fig. 1). For example, a dc brush motor controller in an automotive power mirror application is served easily by a simple MCU. Fig. 1. A robust controller improves system integration. The main vehicle controller then integrates functions, such as settings for multiple drivers and so on, around the MCU module. Another example of such simple control systems is a stepper MCU IC that manages a stepper motor, and may operate under the supervision of another part of the system. Realworld applications A more sophisticated system, where greater performance is needed, can use a smarter algorithm in a programmable processor to improve system performance and reduce system cost. For example, a vector control algorithm enables an induction motor to perform the sharp and precise motion profiles needed in a washing machine. Positioning servomotors used in assembly lines face demanding requirements due to the dynamic specifications needed and system variability. Control for motors in these conditions can only be achieved through the instantaneous monitoring and adjustment of rotor speed and positioning, and an effective means of generating torque. Scalar motor control techniques are limited in the dynamic performance they offer. To work 6 around this problem, system designers often have to overspecify the motor to ensure that the controlled motor can handle all the torque transients (under t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。