电气开题报告和外文翻译----110kv变电站电气部分设计(编辑修改稿)内容摘要:

Power Supply and Distribution System The revolution of electric power system has brought a new big round construction,which is pushing the greater revolution of electric power technique along with the application of new technique and advanced equipment. Especially, the bination of the information technique and electric power technique, to great ex tent, has improved reliability on electric quality and electric supply. The technical development decreases the cost on electric construction and drives innovation of electric work. On the basis of national and internatio nal advanced electric knowledge, the dissertation introduces the research hotspot for present electric power sy etem as following. Firstly, This dissertation introduces the building condition of distribution automation(DA), and brings forward two typical construction modes on DA construction, integrative mode and fission mode .It emphasize the DA structure under the condition of the fission mode and presents the system configuration, the main station scheme, the feeder scheme, the optimized munication scheme etc., which is for DA research reference. Secondly, as for the (DA) trouble measurement, position, isolation and resume, This dissertation analyzes the changes of pressure and current for line problem, gets math equation by educing phase short circuit and problem position under the condition of singlephase and works out equation and several parameter s Uamp。 , s Iamp。 and e Iamp。 table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and work reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self diagnoses and selfanalysis. It also introduces software flow and use for problem judgement and sets a model on work reconstruction and puter flow. Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation remends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA. Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type and social environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural work(ANN),which has been tested it’s validity by example and made to be good practical effect. Fifthly, concerning the lack of concordant wave on preve nting concordant wave and nonpower pensation and noncontinuity on pensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of nonpower need of electric work tre nds and decreasing line loss bined with DA, which have been tested its objective economic benefit throu gh counting example. Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group petitio n in shortterm trade under the way of grouped price and quantity harmony, but also puts forward bination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term petitive price with improvement on petitive percentage and cut down the unfair ine difference of electric factory, at the same time, it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market work. The distribution work is an important link among the power system. Its neu。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。