电气专业毕业设计外文翻译----电力变压器工作原理-电气类(编辑修改稿)内容摘要:

v e n tim e which is Faraday’s law applied to a finite time interval. It follows that Eavg = N 21/(2 )mf = 4fNφm which N is the number of turns on the winding. Form ac circuit theory, the effective or rootmeansquare (rms) voltage for a sine wave is times the average voltage。 thus E = Since the same flux links with the primary and secondary windings, the voltage per turn in each winding is the same. Hence Ep = and Es = where Ep and Es are the number of turn on the primary and secondary windings, respectively. The ratio of primary to secondary induced voltage is called the transformation ratio. Denoting this ratio by a, it is seen that a = psEE = psNN Assume that the output power of a transformer equals its input power, not a bad sumption in practice considering the high efficiencies. What we really are saying is that we are dealing with an ideal transformer。 that is, it has no losses. Thus Pm = Pout or VpIp primary PF = VsIs secondary PF where PF is the power factor. For the abovestated assumption it means that the power factor on primary and secondary sides are equal。 therefore VpIp = VsIs from which is obtained psVV = psII ≌ psEE ≌ a It shows that as an approximation the terminal voltage ratio equals the turns ratio. The primary and secondary current, on the other hand, are inversely related to the turns ratio. The turns ratio gives a measure of how much the secondary voltage is raised or lowered in relation to the pr imary voltage. To calculate the voltage regulation, we need more information. The ratio of the terminal voltage varies somewhat depending on the load and its power factor. In practice, the transformation ratio is obtained from the nameplate data, which list the primary and secondary voltage under fullload condition. When the secondary voltage Vs is reduced pared to the primary voltage, the transformation is said to be a stepdown transformer: conversely, if this voltage is raised, it is called a stepu。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。