电气专业外文文献翻译---智能照明控制系统-电气类(编辑修改稿)内容摘要:
d starshaped structurebased hybrid. Both forms have the characteristics of a number of bus more flexibility, easy expansion, control of relative independence, lower costs。 mixed some high reliability, fault diagnosis and rule out the simple, easy access to the agreement, transfer rate higher. Engineering design, we consider the building of intelligent lighting control system 山东建筑大学毕业设计外文文献及译文 3 as an independent subsystem, use of international standards and agreements of the munication interface text, into the intelligent building management systems. Intelligent lighting control system uses a distributed, distributionbased approach,that is, the dimming control unit is relatively independent, selfcontained,noninterfering, through centralized management and information interfaces, and intelligent building management system linked to the achievement of the building control center subsystem of the collection and monitoring of the signal. In short, the intelligent lighting control should be the main system is a centralized management, and the main trunk and information interface ponents consisting of the regional implementation of the same sample of control and signal works。 its subsystems should be a dimmer by the various types of modules , control panels, illumination detector dynamic and static and dynamic ponents consisting of detectors, respectively, of the regional implementation of the specific control of different works, the main system and subsystems, such as between the ponents through the interface to connect, to achieve data transmission. 3 Intelligent lighting control system and control of the control of the content A project to control the use of intelligent lighting control system include the following categories: technology office hall, puter center and other important room, lecture hall, such as multifunction hall, exhibition hall, conference center, lobby and courtyard, walkways and elevators, such as the Office of Public site。 building facade lighting ingeneral and also by the intelligent lighting control systems to control switch signal. Control the content of the term of the Interpretation: (1) clock control Clock management, etc. through the electrical ponents, to achieve the normal work of regions for the state of lighting in different time control. (2) the automatic adjustment control illumination Through each module and illumination dimming dynamic electrical ponents such as detectors, to achieve under normal conditions in the regions for the normal work of the state of the automatic lighting dimming control, making the region, such 山东建筑大学毕业设计外文文献及译文 3 as illumination will not be outside with the sunshine factors change, and always maintain the default value in the illumination around. (3) control of the regional scene Through each dimmer module and the control panel and other electrical ponents, to achieve under normal conditions in the regions for the normal work of the state of the scene light。电气专业外文文献翻译---智能照明控制系统-电气类(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。