电气专业中英文资料翻译----110kv供电系统继电保护作用浅析-电气类(编辑修改稿)内容摘要:
liability. The reliability is refers to the protection to be supposed to move time the body should act not when the movement should reliable not reliability is to the relay protection installment performance most basic request. (2) selectivity. The selectivity is refers first by the breakdown equipment logical 39。 OR39。 3 circuit itself protection excision breakdown, when the breakdown equipment logical 39。 OR39。 circuit itself protection or the circuit breaker resist moves, only then allows by the neighboring equipment to protect, the line protection or the circuit breaker malfunction protection excision order to guarantee has in the coordinate request protection and the identical protection has the coordinate request two parts (for example start and trip part or block system and movement part) the selectivity to the neighboring equipment and the line, its sensitivity coefficient and the operating time, should coordinate mutually in the ordinary circumstances. (3) sensitivity. The sensitivity is refers when the equipment logical 39。 OR39。 circuit occurs by the extent of protection in the metallicity short circuit, the protective device should have the essential sensitivity coefficient, each kind of protection smallest sensitivity coefficient has the specific stipulation in the and sensitive request, through relay protection installation realization. (4) speed. The speed is refers to the protective device to be supposed to excise the short circuit breakdown as soon as possible, its date enhances the system stability, reduces the breakdown equipment and the line damage degree, reduces the breakdown to affect the scope, enhances automatic switches on again with the emergency power supply or the emergency apparatus automatic investment effect and so on. Third, relay protection in 11OKV power supply system Chen Ai function 1. The guarantee continues the electricity system the reliability is plays the relay protection installment role the premise. Continues the electricity system the reliability is plays the relay protection installment role the speaking the relay protection reliability mainly by the disposition reasonable, the quality and the technical performance fine relay protection installment。电气专业中英文资料翻译----110kv供电系统继电保护作用浅析-电气类(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。