电力系统自动化外文翻译资料(编辑修改稿)内容摘要:

ations varies widely. Many of these IED s are still useful but lack the most recent protocols. A munications processor that can municate with each IED via a unique baud rate and protocol extends the time that each IED is useful. Using a munications processor for substation integration also easily acmodates future IED s. It is rare for all existing IED s to be discarded during a substation integration upgrade project. The benefits of monitoring, remote control, and automation of power delivery include improved employee and public safety, and deferment of the cost of purchasing new equipment. Also, reduced operation and maintenance costs are realized through improved use of existing facilities and optimized performance of the power system through reduced losses associa ted with outages and improved voltage profile. Collection of information can result in better planning and system design, and increased customer satisfaction will result from improved responsiveness, service reliability, and power quality. Power system automation includes a variety of equipment. The principal items are listed and briefly described below. Instrument transformers are used to sense power system current and voltage. They are physically connected to power system apparatus and convert the actual power system signals, which includes high voltage and current magnitudes, down to lower signal levels. Transducers convert the analog output of an instrument transformer from one magnitude to another or from one value type to another, such as from an ac current to dc voltage. As the name implies, a remote terminal device, RTU, is an IED that can be installed in a remote location, and acts as a termination point for filed contacts. A dedicated pair of copper conductors are used to sense every c ontract and transducer value. These conductors originated at the power system device, are installed i。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。