甲醇合成的外文翻译---一种新的低温甲醇合成路线:酒精溶剂的催化效应(编辑修改稿)内容摘要:
As a result, ROH attacked the carbon atom of HCOOCu, the intermediate of step (2), more slowly. But the spatial obstacle of 1butanol is the smallest among all butanols, and this is favorable to the nucleophilic 外文资料原文 6 attack in the esterification reaction. On the other hand, isobutanol has high electronic density in its oxygen atom and this should accelerate the reaction. But its large molecular volume became a severe spatial obstacle in the nucleophilic attack. So its esterification rate was low. As a balanced effect between electronic factor and spatial factor, 2butanol exhibited highest activity among 4 butanols, in the ratedetermining step (2). As the opposite example, tertbutyl alcohol gave the yield of methanol as low as % here. It should be pointed out that the accumulated ester (HCOOR) can be easily transferred to methanol and ROH under higher H2 partial pressure. Two experiments were conducted to demonstrate this. One was the hydrogenation of ethyl formate in a batch reactor and the other was the hydrogenation of 2butyl formate in a flowtype semibatch autoclave reactor. For the first one, the reaction conditions were similar to those used in the synthesis reaction of methanol described above. A mixture gas of H2 and N2 with a total initial pressure of 30 bar (20 bar H2 and 10 bar N2) was used as feed gas. Ethyl formate ( mL) and mL of cyclohexane were mixed and poured into the reactor instead of 20 mL of alcohol. After 2 h reaction, the total conversion of ethyl formate was % and the yield of methanol was %. Methyl formate and CO were byproducts. Methyl formate might e from the transesterification of ethyl formate and the methanol produced. CO might e from the deposition of ethyl formate. For the latter experiment, mL of 2butyl formate (5 times amount in volume of ethyl formate used in the first experiment) and mL of cyclohexane were poured in the reactor. A flow of pure H2 (20 mL/min, 30 bar) was used as flowing gas. After 8 h continuous reaction at 443 K, % of 2butyl formate was transferred to methanol and 2butanol. The total conversions were high while 2alcohols were utilized. But the yields to ester were also high, especially for 2pentanol. It is referred that step (3) above was slower if 2alcohols were used. In other cases, the rate of step (3) was much faster than that of step (2), resulting in the disappearance or very low yield of the 外文资料原文 7 corresponding esters. If the water was added to ethanol with the same molar amount as that of CO2 in the feed gas under standard conditions, and the same experiment was conducted, similar results were obtained. Water did not affect the reaction behavior at these reaction conditions. From the reaction mechanism above, water was only an intermediate, similar to the role of CO2 in steps (1)(3). In Table 2, the influence from various reactant gas position was investigated at 423 K where catalyst Cu/ZnO (B) was used. It is clear that the total reaction rate increased with the increasing of CO2 content in the syngas. The reaction of CO2 +H2 exhibited the highest reaction rate. It seems that methanol synthesis rate was faster from CO2+H2 than from CO+H2, supporting that step (1) in the reaction mechanism was reasonable. It is interesting that pure CO did not react, indicating carbonylation of alcohol to ester impossible. While using pure CO +H2 as reactant gas, ethyl formate formed but methanol was not obtained. The reaction rate was rather lower than that of CO2contained syngas. It is hard to determine the reaction route of pure CO +H2 now, as CO insertion to ethanol to form an ester was excluded. Maybe water contained in the ethanol (about 100150 ppm) reacted with CO to form CO2 and fulfilled steps (1) and (2). 4. Conclusions The use of alcohol, especially 2alcohols, as a catalytic solvent in the synthesis of methanol from CO/CO2/H2, not only realized a new lowtemperature methanol synthesis method, but also overcame drawbacks of the BNL method and other lowtemperature methanol synthesis methods. This effect from acpanying alcoholic solvent decreased greatly the temperature and pressure of the synthesis reaction on Cu/ZnO solid catalyst, via a new reaction path. This method is very promising to bee a new technology for lowtemperature methanol synthesis where purification of syngas is not necessary. Since the reaction employed 外文资料原文 8 conventional solid catalyst, very mild reaction conditions, and syngas containing CO2 and H2O, it might be a promising practical method for methanol synthesis at low temperature. In fact, when the amount (weight) of catalyst was increased, the conversion was increased linearly in our experiments. 5060% conversion was realized in a flowtype semibatch reactor, as lowtemperature methanol synthesis has no thermody。甲醇合成的外文翻译---一种新的低温甲醇合成路线:酒精溶剂的催化效应(编辑修改稿)
相关推荐
因数降低,所以一般工厂的自然功率因数都比较低,它给工厂供配电系统造成不利影响。 根据我国制定的按功率因数调整 收费的办法要求,高压供电的工业用户和高压供电装有带负荷调压装置的电力用户,功率因数应达到 以上,当功率因数低于 ,电业局 9 不予供电。 因此,工厂在改善设备运行性能,合理调整运行方式提高自然功率因数的情况下,都需要安装 无功功率补偿装置,提高工厂供配电系统的功率因数。 在工厂中
a result, ROH attacked the carbon atom of HCOOCu, the intermediate of step (2), more slowly. But the spatial obstacle of 1butanol is the smallest among all butanols, and this is favorable to the
1062。 调试发现,电流不能够满足要求,最终决定在此基础上添加大功率三级管放大,经测试可行。 综上,本系统最终以 LM3S811 作为控制器,用可见光照传感器做检测元件,通过控制直流减速电动机来使激光笔指向点光源。 M C UC o r t e x M 3直 流 减 速 电 机 的控 制水 平 方 向的 电 机垂 直 方 向的 电 机L E D 驱 动 显 示 模 块光 源 检 测 , 传
汉字的点阵数据。 当需要滚动显示时,则可在接下来的扫描周期的每个行扫描中断处理程序中,将对显示缓冲区的相应行点阵数据左移一位,同时更改显示缓冲区的内容。 (需要注意的是,要确保该操作能在 的中断时间内完成。 这里89C52 采用 22MHz 晶振,实验证明可以实现该操作)。 这样,在一个扫描周期后, 6 整个汉字将左移一列,而显示缓冲区的内容也同时更改。 由于预装载区保存了 1 个汉字点阵数据
外部存储器时将跳过一个 ALE 脉 冲。 对 Flash 存储器编程期间,该引脚还要输入编程脉冲( PROG )。 如有必要,可通过对特殊功能寄存器( SFR)区中的 8EH 单元的 D0 位置位, 可禁止 ALE 操作。 该位置位后,只有一条 MOVX 和 MOVC 指令可激活。 此外,此引脚会被微弱拉高,单片机执行外部程序时,应该置 ALE 无效。 PSEN :程序存入允许( PSEN
owever the main factor influencing variability of caro tenoid quality in juice has been shown to be geic diversity. Kato et al. showed that mandarin and orange juices accumμLated high levels of