现代测量技术在采矿中的应用毕业论文外文翻译(编辑修改稿)内容摘要:
GPS and INSAR technology During mining survey, most mon works are involved with monitoring the earth surface deformation, especially in monitoring the mining subsidence and coast. It plays a very important roles in mine safety production. For monitoring mining subsidence, Interferometric synthetic aperture radar (InSAR) and GPS technology are very strong plementary. Firstly, GPS belongs to point positioning, and the length of base line is usually tens to hundreds of kilometers. Such lower point density cannot meet the demand for high spatial resolution monitoring of the surface deformation. InSAR data can apply continuous information off the entire region surface. The spatial resolution can reach to 20 m. Secondly, InSAR (spatially differential InSAR) is sensitive to elevation information of the earth surface owing to the radar incidence angle effect, while GPS is unsubstantial in elevation precision. Thirdly, GPS has high temporal resolution (highest can be up to 1 Hz), while InSAR data has a lower temporal resolution (more than 20 days generally, highest only can be 1 day) because of the loner revisiting period. The integration of TPS total station and GPS As a new instrument which integrate the GPS total station and GPS, Smart Station—a super total station theodolite is practicable. This instrument doesn’t need ground control points, long traverse and resection operation. We can use the total station theodolite to survey and layout only by setting up the Smart Station and use the GPS to locate the occupied station accurately. It can abtain the position information with centimeter level accuracy within very short time while the baseline is short than 50 km. The fusion of GIS and puter work In order to instruct the mine safety production efficiently, many countries are developing mine geographic information system (MGIS) and suing the advanced radio frequency identification device (RFID), puter work technology and Field Bus munication technology in this system, which solved the problem of underground operators accurate positioning and the miner work attendance check. The fusion of GIS and puter work technique provide a well guarantee to mine safety production. 4 New ideas to modern mining survey Setting up and making perfect of Web Mine GIS At present, the foremost task is to sep up the MGIS with integral and powerful functions in the mine construction. It is a management information system. We can exploit systematically, synthetically, dynamicly and roundly ground and underground natural resources by regular and high and new technology, instruments and methods. Based on it, we can set up a mine resource and environmental information system. The system applied spatial information technology is an allaround achievement by integration of 3Stechnology, Total Station and other surveying instruments and technology in the mine surveying. MGIS has been the main aspect and inevitable tendency of the development of mine surveying. It mainly studys on the collection, save, process, analysis, simulation and reappearance of mine time and space data, which has a better editing map ability and connects automatically the spatial data with the attribute data, exploits mine excellently, uses resources reasonably, analyzes and appraises environment and decides regional plan and sustainable development and so on. According to the characteristics of mine plan and construction, MGIS should mainly include many subsystems as follows: mine geology and surveying information system, mine dispatching management information system, mine production management information system, mine destructions and accidents forecast system, mining district plan and mine shaft design information system, mine district land reclaimation management information system and mine subsidence forecast system etc.。现代测量技术在采矿中的应用毕业论文外文翻译(编辑修改稿)
相关推荐
【国家公务员】常识练习题500题(公务员常识) 一、 A.史记 B.春秋 C.论语 D.汉书 A.诗经B.汉书C.诗歌总集D.尔雅 A.神农本草经B.齐民要术C.本草纲目 D.黄帝内经) 照我国宪法规定,下列哪项领导人由全国人民代表大会选举产生。 () 一行政诉讼案中,被告方某行政机关委托刘律师担任诉讼代理人。 刘律师为使案件胜诉,诉讼期间调查收集了充分的证据材料。
通过直接关系到施工企业经济利益的方法来控制进度。 在承包合同中写进有关工期和进度的条款。 建设单位的进度优惠条件和工期提前奖励和延期罚款,通过物资的供应进行控制等。 当前建筑企业施工现场材料管理 中存在的问题在施工现场管理实践中,有些建筑企业管理不严,现场管理混乱,规章制度不执行,施工无计划,操作无标准;工人纪律松弛,生产效率低;各种材料、工具、设备无专人管理,乱丢乱放,浪费惊人
tinues to be monitored. 3 Numerical analysis and conclusions In this section, the simulation results are given. We begin by making the assumption that the process variable has a normal probability
the 1960s the OFDM multichannel data transmission has succeeded uses in Kineplex and the Kathryn high frequency military channels. OFDM has used in Mbit/s high bit rate digital subscriber line (HDSL)
s its intensity and the rigidity, bines the mold together with the metal pattern frame. This kind of pattern making technology craft simple, cost low, manufacture cycle extremely short, the cavity
果的同时为社会公众 提供高质量的会计信息,让信息社会环境下的会计和审计在降低会计信息风险、增加会计信息的价值、减少代理成本和资本成本、建立和维护资本市场的完整性等方面发挥更为重要的作用。 近几年来我国的国内外环境都发生了深刻的变化,加入 WTO 的冲击和影响、信息技术的快速发展、经济和社会的可持续发展已经国内外对生态环境的重视等都都对我国的会计环境产生了一定的影响