现代快速经济制造模具技术外文翻译-模具设计(编辑修改稿)内容摘要:
s its intensity and the rigidity, bines the mold together with the metal pattern frame. This kind of pattern making technology craft simple, cost low, manufacture cycle extremely short, the cavity surface takes shape only needs for several hours, saves the energy and the metal material, general cavity surface 23mm is only thick, simulation greatly strengthened, the pattern precision may achieve mu m. At present this technology widely uses in superficial shape and so on airplane, automobile mold, electrical appliances, furniture, shoemaking, fine arts handicraft is plex and the pattern fine each kind of polyurethane product blow molding, attracts models, the PVC injection, PU bees spongy and each kind of injection takes shape in the mold. electrolytic castings take shape the technology The electrolytic casting takes shape the technical principle to be same with the galvanization, is according to model the mold (readymade product or female mold which makes according to product blueprint) is the datum (negative pole), places in the electrolytic casting fluid (anode), causes in the 5 electrolytic casting fluid the metallic ion to return to original state a latter place deposition on the type mold, forms the metal shell, after strips it, contacts the surface with the type mold namely for the mold the cavity internal surface. This technical main characteristic is saves material, the mold manufacture cycle short, electrolytic casting level degree of hardness may reach 40HRC, enhanced the resistance to wear and the life, roughness, the size precision is pletely consistent with the type mold, is suitable for the injection, attracts models, the blow molding, keeps out models, mold cavity and the electric spark and so on bakelite mold, glass mold, pression casting mold takes shape the electrode manufacture. cavities surfaces fine pattern takes shape etching technology The etching technology is optics, chemistry, the machining synthesis application one kind of technology, its basic principle is makes first the pattern design the film, then in has spread the film on pattern design duplication the photosensitive material on the mold cavity surface, process chemistry processing, the mold cavity surface does not form by the etching partial protectors, then acts according to the mold material quality, the choice corresponding etching craft, pattern design etching in mold internal technical main characteristic is the time short, the expense is low, patching damages the pattern design to be possible to achieve flawlessly. 3 sprinkle to cast into the type system mold technique Sprinkling to cast into technical and mon characteristics of the type system mold is according to the kind piece for basis, sprinkle a convex and cave mold, a surface do not need the machine to physically to mainly have following several categories type in the mold. 4 extrusions takes shape the technology Using the berylliuim copper alloy good thermal conductivity and the stability, after the solid melt aging treatment of metal, use the swaging pressure to make the mold concave model cavity. Its characteristic is makes the cycle short, the cavity precision is high (the IT7 level), surface roughness Ra= mu m, The intensity is high, the life may reach 500,000 times, does not have the environmental pollution. This technology is using the metal material in the thin crystal grain, certainly takes shape the temperature, under the low distortion speed condition, when the material has the best superplasticity, toes attend to carry out raised mold which the initiative finishes, then may extrude the concave mold with the small strength one kind of fast economical pattern making technology. Ultra models takes shape material typical representative is Zn22%AL. 5 does not have the mold multi spots forming technology Does not have the mo。现代快速经济制造模具技术外文翻译-模具设计(编辑修改稿)
相关推荐
the 1960s the OFDM multichannel data transmission has succeeded uses in Kineplex and the Kathryn high frequency military channels. OFDM has used in Mbit/s high bit rate digital subscriber line (HDSL)
GPS and INSAR technology During mining survey, most mon works are involved with monitoring the earth surface deformation, especially in monitoring the mining subsidence and coast. It plays a very
【国家公务员】常识练习题500题(公务员常识) 一、 A.史记 B.春秋 C.论语 D.汉书 A.诗经B.汉书C.诗歌总集D.尔雅 A.神农本草经B.齐民要术C.本草纲目 D.黄帝内经) 照我国宪法规定,下列哪项领导人由全国人民代表大会选举产生。 () 一行政诉讼案中,被告方某行政机关委托刘律师担任诉讼代理人。 刘律师为使案件胜诉,诉讼期间调查收集了充分的证据材料。
果的同时为社会公众 提供高质量的会计信息,让信息社会环境下的会计和审计在降低会计信息风险、增加会计信息的价值、减少代理成本和资本成本、建立和维护资本市场的完整性等方面发挥更为重要的作用。 近几年来我国的国内外环境都发生了深刻的变化,加入 WTO 的冲击和影响、信息技术的快速发展、经济和社会的可持续发展已经国内外对生态环境的重视等都都对我国的会计环境产生了一定的影响
r. Food is organic in nature, having an animal or plant source. One characteristic of such organic matter is that, by and large, it has a limited natural biological life. A cut of meat, left to
借此机会,成立“心翼基金”,帮助灾区的孩子们以及我校需要帮助的贫困学生。 活动时间: 2020 年 11 月 14日 活动地点: 西七 311 活动流程: 主持人 主持活动开始, 介绍 到场 嘉宾 及学校与会领导 环资学院 赵丽 老师,介绍 08 年暑期我院总体的社会实践组织工作(主要突出在地震期间这一特殊情况, 我院在危难时刻,顶着学校严重受损、人员不足、资金不足等困难的严峻考验