消防相关外文翻译(编辑修改稿)内容摘要:

ll, hall, dining room, multipurpose hall and so on) and the main thoroughfare and so on place, the personnel very is all centralized, and mainly disperses the channel. Therefore should report to the police the button in these public active places main access establishment manual fires。 The manual fire establishes which in the main thoroughfare reports to the police the button to guarantee to a manual fire which most is close to reports to the police the button distance from a fire protection district any position not to be supposed to be bigger than 30 meters. 3rd, the fire emergency broadcasts the speaker the establishment The aisle, the hall, the dining room and so on the public place personnel very are all centralized, and mainly disperses the channel. Therefore should press in these public places to a recent speaker distance is not bigger than 25 meters from a fire protection district any spot and in the aisle last should not be bigger than meters the speaker to the aisle terminal distance the establishment fire emergency to broadcast the speaker。 Next also should establish the fire in the public bathroom place emergency to broadcast the speaker. The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to e in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, also has the fire door separation and the sounds of people is confused and noisy, therefore should establish the fire emergency to broadcast the speaker. In front of the mon elevator the room also should establish the fire emergency to broadcast the speaker. Disperses the stair hall also is has when the fire the personnel to disperse which saves goal with the fire prevention, also the sounds of people are confused and noisy, therefore should establish the fire emergency to broadcast the speaker, by favors the fire emergency broadcast to disperse the instruction. 4th, fire alarm installment establishment The establishment fire emergency broadcast fire autoalarm system, the author thought also should install the fire alarm installment, but its control procedure should be: The alarm apparatus should confirm after the fire, uses manual or the automatic control mode unification to the fire correlation region transmission warning, stops the alarm apparatus work in the stipulation time, the rapid linkage fire emergency broadcast and broadcasts to the people disperses the instruction. The fire alarm installment establishment position, the author thought should report to the police the button position with the manual fire to be same, its wall surface installment should for be apart from the ground meters highly 5th, fire special use telephone establishment Installs the fire special use telephone extension telephone, should be located the engine room which related also some people is on duty frequently with the fire linkage control (including fire water plant, spare electricity generation engine room, matches substation, mainly ventilates with air conditioning engine room, discharges fume engine room, fire prevention elevator machine room and other), the fire fighting control system operates the equipment place or the control room, the fire duty officers observation room, the security manages spot and so on public room. Sedan of theater box the fire elevator and in the ordinary elevator all should suppose the special use telephone, requests the elevator machine room and the elevator sedan theater box, the elevator machine room and the fire control room, the elevator sedan theater box and the fire control room and so on three positions is reliable to speaks the correspondence telephone system. Usually in fire control room。 The establishment elevator monitoring demonstration plate (including position indicator, direction indicating lamp, to speaks correspondence telephone, trouble lamp and so on), in order to carries on the necessity to the elevator running status which in the surveillance and the emergency case equipped with the manual fire to report to the police position and so on button, fire hydrant button also should install the fire special use telephone receptacle. Third, fire linkage control 1st, the fire linkage control should include the control fire pump to open, to stop, also should demonstrate opens pumps the button the position and the fire pump work and the malfunction. When the fire hydrant is equipped with the fire hydrant button, its electric installation work spot also should demonstrate the fire pump the working mode active status (namely establishment fire pump work indicating lamp). 2nd, the fire linkage control should include the control spraying of water and the water atomization fire fighting system opens, stops, also should demonstrate the fire pump the work and the malfunction and the fluent display, reports to the police the valve, the safety signal valve working mode active status. In addition, to the basin, the water tank water level also should carry on the demonstration monitor。 In order to prevent the overhaul signal valve is shut down, the author thought should use the belt electric signal the control signal valve by to demonstrate it opens the condition. 3rd, the fire linkage control other controls and the demonstration function, should carry out the present national related standard and the standard specific stipulation.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。