注射成型机外文翻译(编辑修改稿)内容摘要:
ementary material to the mold cavity, and to ensure that products have a certain density and 5 dimensional tolerances). The basic requirements of the injection molded plastics, injection and molding. The plasticizing premise to achieve and guarantee the quality of the molded part, to meet the requirements of forming, injection must ensure there is enough pressure and speed. The same time, due to the high injection pressure, the corresponding cavity to produce a high pressure (average pressure of the cavity is generally between 20 ~ 45MPa), so there must be large enough clamping force. Thus, the injection unit and clamping devices are key ponents of the injection molding machine. Mainly in three aspects of the evaluation of plastic products, and the first appearance of quality, integrity, color, luster。 the second is between the size and relative position accuracy。 the third is to use the corresponding physical properties, chemical properties, electrical properties. These quality requirements are also different according to the different products using the occasion to require the scale. Defects of products is that the mold design, manufacturin g precision and wear. In fact, the technical staff of the plastic processing plants often suffer from the face of technology means to pensate for the problems brought about by the mold defects but not the effectiveness of a difficult situation. Regulation of technology in the production process is the essential way to improve product quality and yield. Injection cycle is very short, if the process conditions are handled badly, the waste will be an endless supply. Adjustment process when the best time to change a condition to observe a few times, pressure, temperature, time, all with the tone, it could easily lead to confusion and misunderstanding, a problem do not know what reason. Measures to adjust the process, means, in many ways. Example: solving products Note dissatisfaction there is more than a dozen possible solutions to choose to address the crux of the problem, two major programs, in order to really solve the problem. In addition, attention should be paid to the dialectical relationship between the solution. Such as: products the depression, sometimes to raise the melt temperature, sometimes to reduce the melt temperature。 sometimes to increase the quantity, and sometimes to reduce the feeding amount. To recognize the reverse feasibility of measures to solve the problem. Classification and characteristics Injection molding machine in accordance with the arrangement of the injection unit and clamping devices can be divided into vertical, horizontal and vertical and horizontal posite. Its own characteristics as follows: (a) the characteristics of vertical injection molding machine: 1, the injection unit and clamping devices in the same vertical center line, and the mold opening and closing along the upper and lower direction. Its covers an area of only about half of the horizontal plane, the。注射成型机外文翻译(编辑修改稿)
相关推荐
95 年推出的一种编程语言。 该语言具有安全、跨平台、面向对象、简单、适用于网络等显著特点。 JAVA 程序的执行主要是通过 JAVA 虚拟机实现的。 JAVA 虚拟机是利用软件模拟的计算机,可以在任何处理 器上安全并兼容地执行经编译生成的 JAVA 程序目标文件中的字节码。 JAVA 执行的过程是先由 JAVA 编译器负责将源程序编译成为字节码文件,再由 JAVA 虚拟机中的 JAVA
主流道、主流道衬套及定位圈的设计 定位圈是使浇口套和注射机喷嘴孔对准定位所用。 定位圈直径 D为与注射机定位配合直径,应按选用注射机的定位孔直径确定。 直径 D 一般比注射机定位孔直径小~ ,以便装模。 定位圈一般采用 45 号钢或 Q275 钢。 定位圈用六角螺钉固定在模板上时,一般用两个以上的 M6~ M8 的内六角螺钉。 这里选用定位圈与浇口套为一体,压配于模板内。 图
国的这些伟大成就所自豪。 三. 引申到对我国各民族的一些风俗文化的介绍,尽量选择一些我校少数民族同学前往支教,通过他们自己的亲身经历,结合少数民族地区的文化和景点知识,丰富小学生的见识 ,让他们坐在教室里就能领略到祖国的大好河山。 科学技术知识 : 我国神舟七号载人航天任务的圆满成功,让中国人在太空中留下了第一个脚印,举国都在关注此事。 值此时机,我们以神舟七号为主题
where subscripts I, II represent the parameters of Part I and Part II, respectively, and CmI and CmII indicate the moving free meltfronts of the surfaces of the divided two parts in the filling stage
so obvious. Therefore, will take a broad view the future, international, the domestic mold market overall development tendency prospect will favor, estimated the Chinese mold will obtain the high
公务员联考行测数学运算一题多解评测 对于 2011 年 务员联考的行测中数学运算的题目来说,有很多的解题方法和思维角度比较特殊,而且有不止一种思考角度和解法,这就需要考生在日常的练习中,多掌握解题方法,以至从题目之间的联系上总结出适合此类题目的方法或是比较快的解法。 对于 2011 年 务员联考的行测中数学运算的题目来说,有很多的解题方法和思维角度比较特殊,而且有不止一种思考角度和解法