汽车悬架外文翻译-汽车设计(编辑修改稿)内容摘要:

nd feeling machine, with in advance the critical value that set up proceeds the parison putes, immediately certain at where full general how big of loading and adding to . The active in car a liquid presses with the air type: From the angle demarcation of the control dint, the of can is divided into passive of , active of in half with active of . Current, the automotive a system has the spring coil with reduce to flap the machine mostly, theincapable source inside a system insupplies the device, its flexibility can39。 t change with the exterior work with the , therefore calling that this kind of is passive of . Active an action for thering is direct dint in conduct and actions taking place machine, can according to input and output the superior feedback of proceeding control, making a the of has to reduce to shake the characteristic bestly, toing increase the automotive and going smoothly with manipulate the constitutes with a dint occurrence machine Fe from the flexibility a C. Half active a spring coil for can seeing making from variable characteristic with machine that reducing and flapping the a system constitutes, although it can39。 t proceed the superior control with regulate with the outsider importation, it can press saving under every kind of term of the calculator superior spring coil with reduce to flap the machine excellent to turn the parameter instruction to regulate the spring coil just a the appearance of for with reducing flapping from flexibility a C with a per coefficient can the machine of regulated within the scope of big constitute. The electronics technique control car a system is main from( the car is high and change direction the Cape, acceleration, road the estimate) spread to feel the machine, electronics control ECU, of control of carry out machine etc. control function of the system usually has below three: 1 the car is high to adjust to be the car at rise and fall When the uneven road drive, can make carriage jacked up, in order to in pass。 When the good road mades good time, can lower the carriage, to reduce the air help, increase to manipulate the stability. 2 dint controls is used to increase to manipulate the stability automotively, in the flashback curved, nasty accelerates to move with the urgent system circumstance next, can rr is to the side , horizontal put the flutter with the control of the carriage can more quick, precision, the car mades good time with the stability exaltation of the turn, carriage side ex in carriage is small when system move, starting with nasty accelerate can after reducing .Even in the bad road, the flutter of the carriage too less, the tire increases to the adhesive strength of the ground. active type liquid presses of The active type liquid that electronics control presses a quantity for can according to of with acceleration etc., making use of the liquid press the parts actively automotive vibration in active type liquid presses a the of arrange to is sepress the variety of the carriage. 3 spring coil just a control changes spring coil just degree, make a contented sport or fortable request. Adopt an empress, cahown as diagram on the car, having in the nearby gearing in center of gravity in car lengthways, horizontal acceleration with horizontal put the top preads to feel machine, use to collect the carriage the vibration, the car wheel jumps about, carriage。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。