残疾人轮椅设计2(编辑修改稿)内容摘要:
, 22(3): 13 [16].刘成良,张凯,付庄.神经网络在机器人路径规划中的应用研究.机器人. 20xx,23(7): 1~ 4 外文翻译 GEAR AND SHAFT INTRODUCTION Si Tuzhong Abstract: The important position of the wheel gear and shaft can falter in traditional machine and modern wheel gear and shafts mainly install the direction that delivers the dint at the principal axis passing to process to make them can is divided into many model 18 numbers, useding for many situations we must be the multilayers to the understanding of the wheel gear and shaft in many ways . Key words: Wheel gear。 Shaft In the force analysis of spur gears, the forces are assumed to act in a single plane. We shall study gears in which the forces have three dimensions. The reason for this, in the case of helical gears, is that the teeth are not parallel to the axis of rotation. And in the case of bevel gears, the rotational axes are not parallel to each other. There are also other reasons, as we shall learn. Helical gears are used to transmit motion between parallel shafts. The helix angle is the same on each gear, but one gear must have a righthand helix and the other a lefthand helix. The shape of the tooth is an involute helicoid. If a piece of paper cut in the shape of a parallelogram is wrapped around a cylinder, the angular edge of the paper bees a helix. If we unwind this paper, each point on the angular edge generates an involute curve. The surface obtained when every point on the edge generates an involute is called an involute helicoid. The initial contact of spurgear teeth is a line extending all the way across the face of the tooth. The initial contact of helical gear teeth is a point, which changes into a line as the teeth e into more engagement. In spur gears the line of contact is parallel to the axis of the rotation。 in helical gears, the line is diagonal across the face of the tooth. It is this gradual of the teeth and the smooth transfer of load from one tooth to another, which give helical gears the ability to transmit heavy loads at high speeds. Helical gears subject the shaft bearings to both radial and thrust loads. When the thrust loads bee high or are objectionable for other reasons, it may be desirable to use double helical gears. A double helical gear (herringbone) is equivalent to two helical gears of opposite hand, mounted side by side on the same shaft. They develop opposite thrust reactions and thus cancel out the thrust load. When two or more single helical gears are mounted on the same shaft, the hand of the gears should be selected so as to produce the minimum thrust , or spiral, gears are those in which the shaft centerlines are neither parallel nor intersecting. The teeth of crossedhelical fears have point contact with each other, which changes to line contact as the gears wear in. For this reason they will carry out very small loads and are mainly for instrumental applications, and are definitely not remended for 19 use in the transmission of power. There is on difference between a crossed helical gear and a helical gear until they are mounted in mesh with each other. They are manufactured in the same way. A pair of meshed crossed helical gears usually have the same hand。 that is ,a righthand driver goes with a righthand driven. In the design of crossedhelical gears, the minimum sliding velocity is obtained when the helix angle are equal. However, when the helix angle are not equal, the gear with the larger helix angle should be used as the driver if both gears have the same hand. Worm gears are similar to crossed helical gears. The pinion or worm has a small number of teeth, usually one to four, and since they pletely wrap around the pitch cylinder they are called threads. Its mating gear is called a worm gear, which is not a true helical gear. A worm and worm gear are used to provide a high angularvelocity reduction between nonintersecting shafts which are usually at right angle. The worm gear is not a helical gear because its face is made concave to fit the curvature of the worm in order to provide line contact instead of point contact. However, a disadvantage of worm gearing is the high sliding velocities across the teeth, the same as with crossed helical gears. Worm gearing are either single or double enveloping. A singleenveloping gearing is one in which the gear wraps around or partially encloses the worm.. A gearing in which each element partially encloses the other is, of course, a doubleenveloping worm gearing. The important difference between the two is that area contact exists between the teeth of doubleenveloping gears while only line contact between those of singleenveloping gears. The worm and worm gear of a set have the same hand of helix as for crossed helical gears, but the helix angles are usually quite different. The helix angle on the worm is generally quite large, and that on the gear very small. Because of this, it is usual to specify the lead angle on the worm, which is the plement of the worm helix angle, and the helix angle on the gear。 the two angles are equal for a 90deg. Shaft angle. When gears are to be used to transmit motion between intersecting shaft, some of bevel gear is required. Although bevel gear are usually made for a shaft angle of 90 deg. They may be produced for almost any shaft angle. The teeth may be cast, milled, or generated. Only the generated。残疾人轮椅设计2(编辑修改稿)
相关推荐
,三废少、污染小、易治理。 ( 5) 本工艺氨耗量小,氨比只在 2左右。 ( 6) 本工艺原材料消耗小,产品附加值高。 ( 7) 本工艺采用专用氨氧化沸腾床,并 设计特殊的加料方式。 四、 中试的主要设备见表 7 序号 名称 型号 材料 数量 单价 小计 1 锅炉 4 吨 A3 1 台 40 万元 40 万元 2 冷冻机 125 万大卡 A3 2 台 35 万元 70 万元 3 反应釜
建筑节能职能部门 (章) 年 月 日 注: “建筑节能技术措施基本情况”栏的内容由建设单位或者委托设计单位填写,审查结论由施工图设计审查机构填写,并按程序交相关部门审核; “住宅建筑节能审查备案情况”栏的内容分别由施工图审查机构、建筑节能职能部门填写; 本表按单位工程项目填写; 有关指标的计算应另附计算书或说明。 附表二 民用建筑节能设计备案登记表 (公共建筑部分) 特别承诺
的行为, 违反了。 根据 的规定 本单位拟对你(单位)作出 的处罚。 根据《中华人民共和国行政处罚法》第四十二条的规定,你(单 位)有权要求听证, 如你(单位)要求举行听证,应当在收到本告知书后三日内,向本单位书面或口头提出听证申请地址: ,邮政编码: 联系电话:。 逾期将视为放弃听证权利。 单位(印章) 年 月 日 安徽省水利厅监制 本文书一式 份 《中华人民共和国行政处罚法》 第四十二条
吉雅》、《蓝色安代》等一批艺术精品走向市场。 “ 8 18”哲里木赛马节、大青沟民俗文化旅游节、科尔沁草原婚礼节、科左后旗阿古拉“双合尔楚古兰”节、青龙山登山节、库伦安代艺术节、科尔沁区金秋采摘节等文化旅游接待游客 万人次,实现总收入 亿元,既创造了可观的经济效益,又促进了文化产业发展。 通辽市民族文化产业虽然 取得了较快发展, 但在民族文化产品开发上还较落后,具有科尔沁文化特点的版画、皮雕画
四、 类似的案例分析 1. 上海陆家嘴金融中心区 规划概况,优点,建筑案例分析 上海商务中心区( SCBD)包括陆家嘴中心区、外滩及南、北外滩等,其中,陆家嘴中心区为核心,南、北外滩是 SCBD 未来发展的方向。 SCBD 总用地约 平方公里,规划总建筑面积约 1000 万平方米。 陆家嘴中心区以 “滨江绿地 +中央绿地 +沿发展轴绿带 ”的旷地系统作 为结构基本要素,分为东、西、南、北、中 5
6 月 15 日 (2)软基处理 : 20xx 年 6 月 15 日 ~20xx 年 8 月 20 日 (3)路基填筑与路基挖方 : 20xx年 6 月 25 日 ~20xx 年 10 月 25日 主要工作:填筑 70%与路基挖方 60% 20xx 年 10月 25 日 ~20xx 年 3 月 25 日 主要工作:石方爆破 75%与弃方 85% 20xx 年 3 月 25 日 ~20xx年 5