附件一报告撰写格式及样本(编辑修改稿)内容摘要:
ed results for both singlespiral and twinspiral type phase inverters. The corresponding simulated results are in good agreement with the measured ones and are not shown in Fig. 2. The bandwidth of twinspiral type phase inverter is greater than that of singlespiral type phase inverter, as expected. Fig. 2 also pares the normalized power losses of singlespiral and twinspiral type phase inverters. They are calculated by the equation 221211 ||||1 SS . The normalized power loss of singlespiral type inverter is lower than that of twinspiral type inverter due to the cancellation effect of Efield distributions. However, the radiation loss of the twinspiral type phase inverter is still smaller than that of the radialtype phase inverter [7] because of its outofphase excitation. UNIPLANAR 180176。 HYBRIDRING COUPLERS Fig. 3 shows the proposed novel uniplanar 180176。 hybridring coupler with twinspiral type phase inverter. The singlespiral type hybridring coupler has the same circuit layout except that the twinspiral type phase inverter is replaced by the 5 singlespiral one. The impedance of the ring is given by oring ZZ 2 , where 0Z is the port impedance which is chosen as 75 . The length of each arm is quarter wavelength at the center frequency and the dimensions of both phase inverters are the same as those of Fig. 1. The bondwires at the Tjunctions are used to suppress the undesired coupled slotline mode generated at these discontinuities. In this study, both singlespiral and twinspiral type hybridring couplers are designed at center frequency 2GHz and fabricated on the FR4 substrate. In simulation, the coupler (fourport work) is divided into four Tjunctions (threeport works) and four twoport works. These twoport and threeport works are simulated separately by the IE3D software and the results are cascaded and bined to analyze the performance of the hybridring coupler. The measured and simulated results of the hybridring coupler with singlespiral type phase inverter are shown in Fig. 4. The measured results agree well with the simulated ones. Fig. 5 shows the simulated and measured results for the hybridring coupler with twinspiral type phase inverter. The isolation between Eport and Hpor。附件一报告撰写格式及样本(编辑修改稿)
相关推荐
..................................................................... 18 销售收入再投入 ......................................................................................................................
风险的同时获得较 高的利息收入。 同时,本基金将维持目前较高比例的短期回购及短期存款投资,进一步优化组合的现金流到期分布,做好组合流动性管理工作,并努力把握资金面阶段性紧张带来的投资机会。 珍惜基金份额持有人的每一分投资和每一份信任,华夏现金增利基金将继续奉行华夏基金管理有限公司“为信任奉献回报”的经营理念,规范运作,审慎投资,勤勉尽责地为基金份额持有人谋求长期、稳定的回报。 167。 5
14 合城乡规划要求。 项目选址处于交通便利、离冷水滩城区不远、环境静谧、距 公用供(排)水、电等基础设施较近的位置,且周边征地方便,利于扩大规模。 选址所在地土质良好,便于建设园林化的生活环境。 目前该项目最为理想的拟建地址已选定 ,各项土地使用权手续正在办理当中。 三、 施工条件 施工场地平整开阔,施工运输可利用现成的公路和城市道路。 高标号水泥、砂石、石灰等建筑材料当地产量可观,能满足供应
图像,并可分组切换显示所有监控点图像。 采用逐行扫描纯平监视器。 投影屏在需要时可选择显示任何一路监控图像,也可分割显示 4 路/9 路 //16 路监控图像,或显示回放监控的录像。 控制及录像部分设计 设置图像管理服务器,对监控图像进行录像管理以及网络( I E 浏览)发布管理。 设置一台视频管理计算机,对电视墙进行显示管理,可分组切换显示;一台存储管理主机对视频监控进行录像。
防汛应急预案 让建筑充满思想 用精品奉献社会 7 7)雨季来临前,要采取一定措施,保证施工道路畅通 ,重点检查 临建设施起重运输机械、脚手架等。 8)焊材必须入库保管,焊材库内设置干湿温度计,派专人负责焊材管理,并做好相应记录。 要求焊材库内温度不低于 5℃,湿度不大于 60%。 焊材入库前,焊材保管员应确认焊材的牌号、规格、入库量、有无损伤等。 入库时,应区别牌号、规格、使用部位进行堆放
Inter/Intra 增值平台、电子 邮件、办公自动化系统、多媒体等应用的上网需求,因而 IP将作为使用最多的协议而被采用,同时需要支持 IPX、 NetBios 和 LLC2 的通信。 网络系统建设要求 建立先进、可靠、灵活的网络系统,为系统信息资源提供有效的服务。 支持各种应用系统:包括 SNA 结构和主机数据库系统, Inter、 Intra及 Web 应用,电子邮件( EMail)