毕业论文外文翻译----标准压电陶瓷材料-材料科学(编辑修改稿)内容摘要:
lity assessment system for electronic ponents (IECQ) Part 2: Sectional specification Qualification approval Section 1: Blank detail specification Assessment level E IEC 6199442 TS Ed. B 1CD Piezoelectric and dielectric devices for frequency control and selection Glossary Part 42: Piezoelectric materials Piezoelectric ceramics TC87 Ultrasonics IEC 61088 (199109) Characteristics and measurements of ultrasonic piezoceramic transducers Specifies the essential electroacoustic characteristics of piezoceramic transducers for industrial application of ultrasonic energy. Also specifies the methods of measuring these characteristics. It has the status of a technical report. SC47E Submittee 47E: Discrete Semiconductor Devices IEC 60747141 (202010) Semiconductor devices Part 141: Semiconductor sensors General and classification Describes general items concerning the specifications for sensors which are basically made of semiconductor materials, but also applicable to sensors using dielectric or ferroelectric materials. IEEEUFFC The IEEEUFFC is the Ultrasonics, Ferroelectrics and Frequency Control section of the Institute of Electrical and Electronics Engineers. The IEEE published some of the most quoted standards related to piezoelectric and ferroelectric materials, including 1761987 IEEE Standard on Piezoelectricity [Description] 外文翻译 4 1801986 IEEE Standard Definitions of Primary Ferroelectric Electric Terms Both these standards have been withdrawn by the IEEE although they are still available from some sources as a historical document. There are currently two active groups working under the IEEEUFFC auspices IEEE Submittee on Loss in Acoustic Materials: Standards on Characterization of Losses in Electromechanical Materials coordinated by Dr Stewart Sherrit (JPL). The aim is to develop new ways of analysing loss through use of plex impedance and to write new IEEE standard based on the analysis. Details of this can be found at the UTMR website. A Draft of the IEEE standard on Ferroelectricity This is a definition of terms for ferroelctrics and is being developed by SusanTrolierMcKinstry. There is a link to this at the IEEEUFFC website but at the time of writing this was not working. US Military Standards The US military have specifications and standards relating to the supply of goods for use in defence, including the following standard MILSTD 1376B (SH) Piezoelectric Ceramic Material and Measurements Guidelines for Sonar Transducers This standard was cancelled in 1999. It is still widely referred to as the source of of the various Navy types for piezoelectric materials. There is also some standards development going on at the UTMR although it is not clear what form these standards will eventually be published as. Committee on Standard Protocols for Single Crystal Piezoelectrics This is coordinated by Dr Lynn EwartPaine (NUWC) on behalf of Dr Wallace Smith ONR and is aimed at producing a protocol for the calculation of the dielectric constant and piezoelectric coefficients for piezoelectric single crystals. VAMAS VAMAS is the Versailles Project on Advanced Materials and Standards and supports world trade in products dependant on advanced materials technologies, through International collaborative projects aimed at providing the technical basis for harmonized measurements, testing, specifications, and standards. The prestandards research activities of VAMAS are organized into technical mittees called Technical Working Areas (TWAs) which are approved by the a steering mittee and led by International Chairmen. A recent technical working area, TWA 24 Performance 外文翻译 5 Related Properties for ElectroCeramics is chaired by Dr. Markys Cain, and there are a number of proposed projects in this area directly related to piezoelectrics. A new VAMAS project An International Interparison of Direct Piezoelectric Coefficient using the Berlincourt Method., has just started. The objective is to determine the experimental variability in the measurement of the piezoelectric coefficient of electroceramic materials via the standard method described as the Berlincourt Method. See the TWA 24 home page for more details. The VAMAS TWA24 home page is hosted at NPL. EIA The Electronic Industries Alliance (EIA) is。毕业论文外文翻译----标准压电陶瓷材料-材料科学(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。