机械设计与制造毕业设计论文中英文翻译外文翻译-机械设计(编辑修改稿)内容摘要:

le detective work, action can be taken to avoid a repeat performance. Keywords: bearings failures life Bearings fail for a number of reasons , but the most mon are misapplication, contamination, improper lubricant, shipping or handling damage,and misalignment. The problem is often not difficult to diagnose because a failed bearing usually leaves telltale signs about what went wrong. However, while a postmortem yields good information, it is better to avoid the process altogether by specifying the bearing correctly in The first place. To do this,it is useful to review the manufacturers sizing guidelines and operating characteristics for the selected bearing. Equally critical is a study of requirements for noise, torque, and runout, as well as possible exposure to contaminants, hostile liquids, and temperature extremes. This can provide further clues as to whether a bearing is right for a job. 1 Why bearings fail About 40% of ball bearing failures are caused by contamination from dust, dirt, shavings, and corrosion. Contamination also causes torque and noise problems, and 8 is often the result of improper handling or the application environment. Fortunately, a bearing failure caused by environment or handling contamination is preventable,and a simple visual examination can easily identify the cause. Conducting a postmortem il1ustrates what to look for on a failed or failing bearing. Then, understanding the mechanism behind the failure, such as brinelling or fatigue, helps eliminate the source of the problem. Brinelling is one type of bearing failure easily avoided by proper handing and assembly. It is characterized by indentations in the bearing raceway caused by shock loading- such as when a bearing is droppedor incorrect assembly. Brinelling usually occurs when loads exceed the material yield point(350,000 psi in SAE 52100 chrome steel). It may also be caused by improper assembly, Which places a load across the races. Raceway dents also produce noise, vibration, and increased torque. A similar defect is a pattern of elliptical dents caused by balls vibrating between raceways while the bearing is not turning. This problem is called false brinelling. It occurs on equipment in transit or that vibrates when not in operation. In addition, debris created by false brinelling acts like an abrasive, further contaminating the bearing. Unlike brinelling, false binelling is often indicated by a reddish color from fretting corrosion in the lubricant. False brinelling is prevented by eliminating vibration sources and keeping the bearing well lubricated. Isolation pads on the equipment or a separate foundation may be required to reduce environmental vibration. Also a light preload on the bearing helps keep the balls and raceway in tight contact. Preloading also helps prevent false brinelling during transit. Seizures can be caused by a lack of internal clearance, improper lubrication, or excessive loading. Before seizing, excessive, friction and heat softens the bearing steel. Overheated bearings often change color, usually to blueblack or straw colored. Friction also causes stress in the retainer, which can break and hasten bearing failure. Premature。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。