机械的外文翻译---tq160履带式全液压推土机-液压系统(编辑修改稿)内容摘要:
can achieve braking. Transmission Shown in Figure 3, TQ160A bulldozers closed doubleloop 4 doublepump hydraulic system, driven by the engine double variable pump, pistontype variable hydraulic motor driven, hydrostatic drive system ponents, and finally tracked vehicle driven by the final drive and steering. Each side of the track system by an independent hydrostatic drive, so that bulldozers can easily achieve pivot turn, greatly enhanced the mobility of the bulldozers and work suitability. Our unique control system of the engine closedloop constant power control system, the central controller (CPU) load based on the size of bulldozers at any time suffered moderator pump swashplate angle control drive system flow to the machine to automatically according to the size of external load adjust speed, fully meet the bulldozers at work on speed and power requirements to ensure the efficiency of machine, to prevent overloading the engine and can make full use of engine power. TQ160A bulldozer driven by electric motor twoblock variable motor, the whole block forward and backward are the two to meet the needs of different conditions. Intelligent alarm system TQ160A three bulldozers with plete intelligent alarm system, through the instrument panel meters, LED, buzzer and LCD monitors to keep it informed of the vehicle running all kinds of information, such as: engine temperature, oil pressure, hydraulic oil temperature, working hours, engine speed and battery charge and discharge。 the sensors to collect information processed by the CPU through the liquid crystal display to determine a text or voice expressed in the form, such as the 5 work of the solenoid valve opening, engine speed and the machine appears failure, etc.。 The display can also。机械的外文翻译---tq160履带式全液压推土机-液压系统(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。