机械毕业外文翻译---混合机工作原理及其优化设计(编辑修改稿)内容摘要:
up. Weightlessness mixer Brief Description: weightlessness mixer is mainly used for dry mortar production process, is the most highspeed dry mortar mixer. Details: Weightlessness mixer works: Weightless horizontal mixer, the cylinder body equipped with a dualaxis direction of rotation relative blade weightless blades per piece of scientific puting, get a reasonable spacing value and angle values, the blades rotate material thrown to the spatial mobility layer, produce instant weight loss (material density differences in the state of weightlessness on the mixed effects) each other fall into each other within the region, the middle level of the formation of a fluidized weightlessness District (weightless District) and the bottom of the rotating vortex, zero gravity machine to form a current layer, the material was a threedimensional posite movement, to form a full range of bined cycle rapidly to achieve uniform mixing purpose. The weightless mixer Scope: Horizontal weightlessness mixer is mainly used for cracking mortar, insulation mortar, adhesive mortar, surface mortar, floor mortar and other various mixing requires high dry mortar and highgrade putty powder. Concrete admixtures, feed, chemical powders, food spices, and other industries have also been a great deal of application. Horizontal weightless Mixer Features: Fast, low power consumption can be sealed operation, the economic environment. 2, you can add throwing knives, mixed with fibrous material. 3, open the door a material way, the time of the warehouse, unloading clean, pact structure. The weightless mixer can be realized less than 17% of the spray operation, plus liquid viscosity much material not suitable. 5, the device is simple and easy maintenance. Weightlessness mixer technical parameters: Model specifications of the nominal volume (m179。 ) each batch of mixed load factor capacity (Kg) Motor power (Kw) CWZ1 1000 400600 CWZ2 2020 8001200 CWZ4 4000 16002400 CWZ8 8000 32004800 3755 CWZ10 10 000 40006000 5575 Mixer optimized design The mixer is an important ponent of the beverage packaging line equipment is the key technology and equipment that directly determines the quality of the finished beverage position. For rapid consumption and fashion features a wide variety of beverage production, mixed than accurate, convenient adjustment, high efficiency and low consumption, reliable operation of the technology to locate, is the goal of the mixer equipment product development. If the mixer as a closed system, temporarily ignore secondary factors related to the system, first focus on the inputoutput relationship of the research system, through the analysis of the basic input output modulus. He Xiaowu, it is essential to water treatment. Drink mixer water is a major ponent of the finished beverage, in accordance with the proportion of mixed drink ingredients through the precise measurement, added to the concentrated slurry mixing process. Required after membrane filtration, ozone or ultraviolet sterilization to ensure that the water quality colorless, odorless and sterile water supply to the mixer. Its degassing in the mixer on. Degassing of the water here in order to plete the followup carbonated. Theoretically, through a different process binations, you can get many different design of the。机械毕业外文翻译---混合机工作原理及其优化设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。