机械外文翻译文献翻译氯化钠、混合时间及设备对面团的热力学特性的影响(编辑修改稿)内容摘要:
was rested another 15 min in the rheometer, before each measurement, allowing relaxation of stresses induced during sample loading to relax. All measurements were performed at a heating rate of 8C/min at fixed frequency of 1 Hz with the oscillation amplitude small enough to ensure linear viscoelasticity. The data are reported as means of measurements made on three samples, where each sample was obtained from a separately prepared batch of dough for each formulation and for the different mixers used. Significant differences in storage modulus (G0) at 1Hz were determined by Least Significant Difference analysis with P%. All statistical analyses were performed with the Stat Soft Version 6. 3. Results and discussion . Flour chemical and physical properties The chemical position and rheological properties of the flour are shown in Table 2. Analysis of Alveograph data categorises the flour used as weak, and as seen by the P/L ratio, the gluten is richer in gliadins than in glutenins The resistance of a gluten dough to extension decreases and extensibility increases with an increasing gliadin to glutenin ratio (Grasberger et al., 2020。 Kim et al., 1988。 Uthayakumuran et al., 2020). 机械专业中英文文 献翻译 . Thermomechanical properties of doughs The same amounts of salt (0, , , % .) were added to both samples (A。 M) to check the effect of salt and different kneading conditions on sample behaviour during dynamic mechanical thermal analysis. This measurement simulates the physicochemical changes that take place during thermal treatment of dough. Figs. 1 and 2 show the effect of salt addition on the storage modulus (G0) during an oscillatory temperature ramp. Below 55 8C, G0, for both samples, gradually decreased as temperature increased, indicating softening of the dough. Thereafter, the storage modulus increased from 55–60 to 80 8C and then slowly decreased. The abrupt increase can be attributed to the gelatinization of starch。 the swelling and distortion of starch granules during gelatinization were responsible for the rapid increase of G0 not only by their action as a filler in the gluten work, but also by promoting effective crosslinking in the system (Dreese et 机械专业中英文文 献翻译 al., 1988). The glutenin fraction of gluten has been found to be more sensitive to heat than the gliadin fraction。 on heating up to 75 8C glutenin proteins unfolds and disulphide/sulphydryl interchange reactions are promoted, thus increasing the molecular size of the aggregates (Dreese et al., 1988。 Peressini et al., 1999). The increase of storage modulus during heating has been reported (He and Hoseney, 1991) to be proportional to the starch content of the dough。 indicating the physicochemical changes in heated dough are essentially due to changes in the starch fraction. For both samples the transition temperature range of salted dough appeared to be shifted to higher values than doughs made without salt (Figs. 1 and 2) as reported previously by Dreese et al. (1988) and Peressini et al. (1999). Moreover, a parison of the slopes obtained from the linear regressions over the temperature range (55–70 8C) where the G0 increased, showed that, in all cas。机械外文翻译文献翻译氯化钠、混合时间及设备对面团的热力学特性的影响(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。