机械外文翻译--连杆,内燃机(编辑修改稿)内容摘要:
the travel of the pistons and piston rings. The con rod is under tremendous stress from the reciprocating load represented by the piston, actually stretching and relaxing with every rotation, and the load increases rapidly with increasing engine speed. Failure of a connecting rod, usually called throwing a rod is one of the most mon causes of catastrophic engine failure in cars, frequently putting the broken rod through the side of the crankcase and thereby rendering the engine irreparable。 it can result from fatigue near a physical defect in the rod, lubrication failure in a bearing due to faulty maintenance, or from failure of the rod bolts from a defect, improper tightening, or reuse of already used (stressed) bolts where not remended. Despite their frequent occurrence on televised petitive automobile events, such failures are quite rare on production cars during normal daily driving. This is because production auto parts have a much larger factor of safety, and often more systematic quality control. When building a high performance engine, great attention is paid to the con rods, eliminating stress risers by such techniques as grinding the edges of the rod to a smooth radius, shot peening to induce pressive surface stresses (to prevent crack initiation), balancing all con rod/piston assemblies to the same weight and Magnafluxing to reveal otherwise invisible small cracks which would cause the rod to fail under stress. In addition, great care is taken to torque the con rod bolts to the exact value specified。 often these bolts must be replaced rather than reused. The big end of the rod is fabricated as a unit and cut or cracked in two to establish precision fit around the big end bearing shell. Therefore, the big end caps are not interchangeable between con rods, and when rebuilding an engine, care must be taken to ensure that the caps of the different con rods are not mixed up. Both the con rod and its bearing cap are usually embossed with the corresponding position number in the engine block. Recent engines such as the Ford liter engine and the Chrysler liter engine, have connecting rods made using powder metallurgy, which allows more precise control of size and weight with less machining and less excess mass to be machined off for balancing. The cap is then separated from the rod by a fracturing process, which results in an uneven mating surface due to the grain of the powdered metal. This ensures that upon reassembly, the cap will be perfectly positioned with respect to the rod, pared to the minor misalignments which can occur if the mating surfaces are both flat. A major source of engine wear is the sideways force exerted on the piston through the con rod by the crankshaft, which typically wears the cylinder into an oval crosssection rather than circular, making it impossible for piston rings to correctly seal against the cylinder walls. Geometrically, it can be seen that longer con rods will。机械外文翻译--连杆,内燃机(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。