机械外文翻译--分布式机床的设计(编辑修改稿)内容摘要:
systems present the advantage of improving performance, modularity, integrity and reliability while allowing incremental expansion without plete hardware replacement. It offers a promising alternative to control system architecture. This paper is dedicated to study a distributed machinetool architecture. It is based on intelligent devices interconnected on munication link. It is characterized by distributed tasks and distributed data, but with unique control access system. It is designed by using standard devices and FIP fieldbus and verified by a experimental implementation, in which the system controls a multiaxis machine to successfully execute a coordinated motion as well as to respond to sensors values changes. The paper is organized as follows. In section 2, the machinetool control system architecture is described. Section 2 gives a brief description of FIP and Section 3 outlines our experimental implementation. We conclude in section 4 with some general remarks and future research perspectives. 2. Machinetool control system architecture The machinetool control system is a realtime and multitask system. Its classical functional architecture is shown in . It consists of three units: user interface/supervisiou/programming unit, servo unit, and sensors/actuators unit. The main mission of this system is to control workpart machining. It includes two different and related tasks aspects: ●to ensure the precise trajectory and speed control of the mobile organs of machinetool. ●to survey the correct execution of this positioning (tracking) process, to react on environment changes as well as to perform the specified operations or actions upon machinetool mechanics. such as tool switching, cooling, lubricating, etc. Fig. 1 Functional architecture Chronologically, this mission is also divided into two steps: control program planning and control program executiug. In the first step, there is no direct action on machinetool multitask nature: “data acquisition and preprocessing” step. While in the second step, the control is effectively executed. It is worth to note that in the second step, the parallelization is possible due to the mechanics, only the motions as well as the operations to be performed are specified. This is the “data acquisition and preprocessing” step. While in the second step, the control is effectively executed. It is worth to note that in the second step, the parallelization is possible due to the multitask nature. fieldbus To meet the realtime munication need in our distributed machinetool, FIP is adopted. In this section, we briefly explain the main technical properties of FIP. FIP (Factory Instrumentation Protocol) is an industrial work designed for the exchange of information between sensors, actuators and control devices such as PLCs, CNCs or robot controllers. The architecture of FIP follows the socalkd reduced OS1 model (Physical layer, Data link layer and Application layer). This architecture makes a clear distinction between realtime munication and conventional message munication. At Data Link layer, there are services as。机械外文翻译--分布式机床的设计(编辑修改稿)
相关推荐
be easy to achieve in the larger context of the lootive speed, but such Motor due to the mutator, manufacturing and maintenance are very plex, and also greater volume), the AC into DC lootive in the
ine the oil film between the piston and cylinder liner, resulting in cylinder scoring. engine temperature is too high As the engine temperature is too high, so that excessive expansion of the piston
iciency of the electric field of the dust. If vapor leaks i n the boiler, flue gas will increase the humidity, although in a very short time because of smoke and quenched and tempered by lower
十七大50个多选题 二、多项选择题1、党的十七大的主题是:高举中国特色社会主义伟大旗帜,以邓小平理论和“三个代表”重要思想为指导,深入贯彻落实科学发展观,_,夺取全面建设小康社会新胜利而奋斗。 A 继续解放思想 B 坚持改革开放C 推动科学发展 D 促进社会和谐2、_是发展中国特色社会主义的基本要求。 A 科学发展 B 改革开放 C 社会和谐 D 求真务实3、为贯彻十六大精神,中央召开七次全会
n. highspeed cutting thin wall ponents change the part substitutes certain crafts, like electric spark machining, abrasive machining and so on High strength and the high degree of hardness39。 s
ration signal analysis and fault feature extraction. However, classical spectrum analysis also has obvious disadvantages. Fourier transform reflects the overall statistical properties of a signal,