机械外文翻译---数控机床开环控制系统-数控设计(编辑修改稿)内容摘要:
l design personnel through the procedure inquiry function, inquires the ponents information from the sharing database which needs, carries on the interactive technological design. Thus has facilitated the CAPP ponents information acquisition, enhanced the technological design efficiency. When carries on the NC programming using UG, may from the sharing database gain the craft and the manufacture information which needs, carries on various working procedures the knife axle design and the processing simulation establishes an absolute zero spot on the numerical control engine bed, the actual various coordinate axes syzygy pletely position error, makes the curve in order to determined pensates the spot. Attempts l to show is an actual position error curve, (error) carries on this curve ycoordinate take the pulse equivalent as the unit the division, makes the horizontal line, each horizontal line and the curve point of intersection namely pensates the spot for the goal. Chart 1 the center 1 to 6 o39。 clock place position errors for, needs to do reduces the pulse to pensate。 But needs to carry on 6 to 9 adds the pulse to pensate in the chart the shadow partially for to pensate the area. Compensates the range of points these to bee the error The calibration corrections stores the puter, when work table by zero displacement in position, installs sends out the absolute zero point localization signal in the absolute zero point micros witch, later puter as necessary will send out the goal to pensate to pensate the signal, will carry on the position error to the engine bed to pensate. The cosine generator assigns slide guage initiation signal a electricity and by step of transmission. 3. feedbacks pensates the openloop control Chart 2 has produced this kind of system schematic diagram. This system surveys two parts by the openloop control and the induction synchromesh direct position to be posed. Here position examination does not serve as the position the feedback, but is pensates the feedback as the position。机械外文翻译---数控机床开环控制系统-数控设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。