中考习题集(答案解析)连词(编辑修改稿)内容摘要:

t 22. (20xx孝感中考 ) _______ Switzerland is very small, ________ it is the land of watch and it is very rich. A. Though。 but B. Because。 so C. Because。 / D. Though。 / 23. (20xx东营中考 ) Remember to return the book to the school library in time, ________ you will be fined (罚款 ). A. or B. and C. but D. then 24 (20xx德州中考 ) __________ Henry’s mother __________ his father speaks English. They both speak Chinese. 3 A. Either。 or B. Neither。 nor C. Both。 and D. Not only。 but also 25. (20xx兰州中考 ) ________ Tom ________ Mary speaks good Chinese, so they can municate with these Chinese students very well. A. Neither。 nor B. Not only。 but also C. Both。 and D. Either。 or 26. (20xx扬州中考 )Work hard, _______ you’11 pass the English exam this time. A. or B. but C. because D. and 27. (20xx长沙中考 ) Was the boy saved? No. The doctors tried their best, _______ they failed A. and B. so C. but 28. (20xx南昌中考 ) We’re going to the bookstore. You can e with us ________ you can meet us there later. A. and B. but C or D. then 29. (20xx恩施中考 ) _________ Lucy _________ Lily may go dancing with you, because they are not allowed to go out on school nights. A. Either。 or B. Neither。 nor C. Both。 and D。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。