中考习题集(答案解析)介词(编辑修改稿)内容摘要:

ing of October 1st, 20xx. A. in B. on C. at D. for 27. (20xx河北 中考 ) Let’s play table tennis ______ Tuesday morning, shall we? A. on B. in C. to D. at 28. (20xx济宁中考 ) We have been doing much better in English ________ our teacher’s help. A. in B. to C. for D. with 29. (20xx深圳中考 ) Which would you like, tea or coffee? Either _________ OK, but I prefer coffee _________ milk. A. is, has B. are, with C. is, with D. are, has 30. (20xx安徽中考 ) –Why are you standing there, Maggie? I can’t see the blackboard clearly. Two tall boys are sitting ______ me. A. behind B. in the front of C. beside D. next to 31. (20xx漳州中考 ) The young men walked ______ the forest and came to a big river at last. A. on B. over C. through D. across 32. (20xx山西 中考 ) ________ a teacher, John thinks that his main duty is to help the students to bee better learners. A. As B. By C. About 33. (20xx临沂 中考 ) What time will you be home? I don’t know. It depends ________ the traffic. A. of B. on C. for D. from 34. (20xx连云港 中考 ) –Is the tie made ________ silk? Yes. It’s made ________ Italy. A. from, in B. of, in C. from, of D. of, from 35. (20xx巴中 中考 ) Thank you very much ________ helping me. Not at all. A. for B. of C. to 36. (20xx莆田 中考 ) He often borrows things ________ others, but he doesn’t lend anything ________ anybody. A. to, from B. from, to C. from, for 37. (20xx咸宁 中考 ) All the clerks went home ________ Mr. Wang. Why? Because he had to finish his work. A. except B. besides C. without D. beside 38. (20xx茂名 中考 ) The fastest way to travel to Shanghai is _______ air . A. in B. by C. on 39. (20xx安徽 中考 ) –What。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。