机械加工毕业设计外文翻译--加工角落:软件改善铸造设计生产力(编辑修改稿)内容摘要:

n set up and evaluate packing profiles to determine the optimal packing pressure and duration of packing. Using the packing analysis results, mold designers can identify areas of high, nonuniform volumetric shrinkage that could contribute to part warpage and view the distribution of cooling time to identify areas that dictate cycle time. The warpage indicator analysis shows the deflected shape of a part—a valuable tool in visualizing the part shrinkage and warpage. Mold designers can also scale the deflected shape for better visualization of part deformation. Using this tool to view the shape of the part, mold designers can evaluate specific areas of the part that need to be within specified warpage levels. The warpage indicator result is a trafficlight (red, yellow, green) plot that highlights the areas where part warpage exceeds a userspecified, acceptable warpage level relative to a userspecified reference plane. Using this tool, mold designers can evaluate whether changes made to the part or mold design, or to the material or process conditions, will bring the part warpage to within acceptable levels. The cooling module simulates the cooling phase of the injection molding process so that users can optimize mold designs for uniform cooling and minimum cycle times. Mold designers can leverage several options to design their cooling circuits, including importing from a CAD system, using an automatic wizard, or using m。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。