机械专业毕业设计外文资料翻译--工艺规程制订与并行工程(编辑修改稿)内容摘要:
operations are often unnecessary, because most of the geometric features that would otherwise require machining can be created by the molding operation. Plastic molding and other operation that require no subsequent secondary processing are called shape processes. Operations that require some but not much secondary processing (usually machining) are referred to as near shape processes. Some impression die forgings are in this category. These parts can often be shaped in the forging operation (basic processes) so that minimal machining (secondary processing) is required. Once the geometry has been established, the next step for some parts is to improve their mechanical and physical properties. Operations to enhance properties do not alter the geometry of the part。 instead, they alter physical properties. Heat treating operations on metal parts are the most mon examples. Similar heating treatments are performed on glass to produce tempered glass. For most manufactured parts, these propertyenhancing operations are not required in the processing sequence. Finally finish operations usually provide a coat on the work parts (or assembly) surface. Examples included electroplating, thin film deposition techniques, and painting. The purpose of the coating is to enhance appearance, change color, or protect the surface from corrosion, abrasion, and so forth. Finishing operations are not required on many parts。 for example, plastic molding rarely require finishing. Whenfinishing is required, it is usually the final step in the processing sequence. Processing Planning for Assemblies The type of assembly method used for a given product depends on factors such as: (1) the anticipated production quantities。 (2) plexity of the assembled product, for example, the number of distinct 10 ponents。 and (3) assembly processes used, for example, mechanical assembly versus welding. For a product that is to be made in relatively small quantities, assembly is usually performed on manual assembly lines. For simple products of a dozen or so ponents, to be made in large quantities, automated assembly systems are appropriate. In any case, there is a precedence order in which the work must be acplished. The precedence requirements are sometimes portrayed graphically on a precedence diagram. Process planning for assembly involves development of assembly instructions, but in more detail .For low production quantities, the entire assembly is pleted at a single station. For high production on an assembly line, process planning consists of allocating work elements to the individual stations of the line, a procedure called line balancing. The assembly line routes the work unit to individual stations in the proper order as determined by the line balance solution. As in process planning for individual ponents, any tools and fixtures required to acplish an assembly task must be determined, designed, built, and the workstation arrangement must be laid out. Make or Buy Decision An important question that arises in process planning is whether a given part should be produced in the pany’s own factory or purchased from an outside vendor, and the answer to this question is known as the make or buy decision. If the pany does not possess the technological equipment or expertise in the particular manufacturing processes required to make the part, then the answer is obvious: The part must be purchased because there is no internal alternative. However, in many cases, the part could either be made internally using existing equipment, or it could be purchased externally from a vendor that process similar manufacturing capability. In our discussion of the make or buy decision, it should be recognized at the outset that nearly all manufactures buy their raw materials from supplies. A machine shop purchases its starting bar stock from a metals distributor and its sand castings from a foundry. A plastic molding plant buys its molding pound from a chemical pany. A stamping press factory purchases sheet metal either fro a distributor or direct from a rolling mill. Very few panies are vertically integrated in their production operations all the way from raw materials, it seems reasonable to consider purchasing at least some of the parts that would otherwise be produced in its own plant. It is probably appropriate to ask the make or buy question for every ponent that is used by the pany. There are a number of factors that enter into the make or buy decision. One would think that cost is the most important factor in determining whether to produce the part or purchase it. If an outside vendor is more proficient than the pany’s own plant in the manufacturing processes used to make the part, then the internal production cost is likely to be greater than the purchase price even after the vendor has included a profit. However, if the decision to purchase results in idle equipment and labor in the pany’s own plant, then the apparent advantage of purchasing the part may be lost. Consider the following example make or Buy Decision. The quoted price for a certain part is $ per unit for 100 units. The part can be produced in the 11 pany’s own plant for $. The ponents of making the part are as follows: Unit raw。机械专业毕业设计外文资料翻译--工艺规程制订与并行工程(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。