机械专业毕业设计外文翻译--现代工程机械行业的技术进步(编辑修改稿)内容摘要:
tricity, Only Hopper CDCC and fort slab leveling tank still use hydraulic transmission. The other is the regional mobile operations in the smaller mining site, the use of electric drive large excavator loaders, Such use of electric drive power transmission cables without the engine installed on the machines. ergonomic innovations : a peopleoriented and simplified operation 1980s of the 20th century, Many of the world39。 s largest engineering machinery manufacturing pany has invested considerable human and financial resources for modern design methodology of the research and used. Ergonomics is a peopleoriented design, with emphasis on the machines mutual coordination and crew safety, driving fort, convenience in the driver39。 s operation and maintenance technologies, such drivers both improved working conditions, and increased production efficiency, and some of the engineering machinery vibration, noise, emissions and the prevention of roller drop from the development of the new standard, and even those laws. Now all kinds of projects are mechanical design roller defense and fallingobject protective devices to protect the personal safety of the drivers, with the cab and are designed and installed. Indoor driving sufficient human space and broad vision, and to take the necessary seals, vibration, noise and temperature control measures. Indoor chairs, pieces of the stick, gauges and the monitor according to ergonomics and design and minimize the 6 manipulation and control of parts. To reduce driver fatigue, to choose the suspension damping chairs, and to develop a gasliquid system hanging with the cab floor. Electronic technology, mechanical engineering applications, which greatly simplifies the driver39。 s operational procedures and to the machine39。 s technical performance. The use of electronic control machine can automatically choose the mode of operation, such as excavators to the three operating modes boom priority, Rotary priorities and microadjustment tandem wheels all vibration and vibration. Electronic monitoring can detect and remove machines system failures, such as engine oil pressure loss. Fan fracture belt drive, hydraulic oil contamination or overheating and oil filter blockage, can promptly lights or audible alarm, by the use of electronic sensor device can handle automatic detection machines quality of the work, If random vibration testing of the degree of paction roller, automatic detection and adjustment of the asphalt mixture ratio and size distribution outlet temperature. American muffler technology pany developed an electronic silencer, electronic equipment engine exhaust noise analysis of the wave structure, and produce a phase difference of 180 176。 with the acoustic interference, This antinoise and the engine exhaust noise offset, which over the purpose of the muffler. Such a muffler can be used to eliminate the basic engine noise and the noise indoor driving. Muffler and isolation through the engineering machinery driving indoor noise can be reduced to 70dB (A) below. In addition, by concentrating on lubrication, automatic lubrication and fault alarm, greatly reducing the engineering and mechanical maintenance workload. Dreiser panies axis articulated loader lubrication cycle extended to 2020h. oil and filter replacement cycle extended to 250h。 Caterpillar loader routine maintenance to shorten the time . 100 hours use of the technical maintenance for only 67min. Creative : industrial design with the environment Modern science and technology of highspeed development, promoting 7 social progress, for humanity to a high degree of material civilization and spiritual civilization. Industrial design is the product of industrial product design, product also known as the art form. Mechanical Products art forms should be able to demonstrate its function in a rational and external quality of uniformity, the product should reflect the advanced technology and meet the aesthetic requirements of modernity. For mechanical engineering, said it was a Paper goods sold, That is an exaggeration, but not to modeling design is certainly not desirable. Modeling the mechanical engineering design of the machine can shape their structure, function and use requirements, paying and with the psychological and physical coordination. This modeling design should include ministries of proper body fluid, color coordination, Instrumentation layout beautiful and easy to operate and intuitive sign in the trademark symbol. Now the world39。 s major panies have attached great importance。机械专业毕业设计外文翻译--现代工程机械行业的技术进步(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。