机械专业毕业设计(论文)外文翻译---用抛丸清理机对板材轧辊进行抛丸处理(编辑修改稿)内容摘要:
, and an exhaust system 6. The equipment is mounted on a special foundation 1905 mm below the floor level The length of the machine withthe trolley out is 15fl00 ram, the height 4070 ram, and the width 4600 mr~ The dimensions of the rolls handled are 400500 mm in diameter and 20204000 mm in length. The total weight of the equipment is 15 tons. As research has shown, the dynamics of the wear of a working mixture of abrasive and the original condition of the shot changes during operation. During blasting, the shot takes on a wider size range and is worn down, forming many fine particles. The conditions under which the parts are blasted depend upon the size of the shot used. The contamination of the specified size by fine particles disrupts the process, producing a poor quality surface on the rolls and consequently on the sheet. To eliminate these problems it is necessary to either 10 regularly measure the position of the shot and make appropriate changes in the blasting sequence, which is difficult to do in practice, or to screen the shot during operation of the machine to provide the specified particle size. Stability in the blasting process is also determined by the quantity of shot delivered to the nozzles. It was experimentally established that supplying kg/sec of shot to the two nozzles in operating with an air pressure of atm provided stable operation. Equipping the machine with screening devices is an effective method for maintaining a constant shot size mix. This is confirmed both by data in the literature and by experience in the operation of SM1 and TsKb_P1 shot blast machines at Zaporozhstal Plant. The shot is delivered to the surface of the roll by the shot blast equipment, the chamber of which is divided by two diaphragms with charging vents into three partments and is equipped with an electropneumatic control device. The working mixture from the upper partment of the chamber drops to the lower and then to the collector. During operation of the machine,the vents are closed (turned on). The shot is poured in either after turning off the valves by the electropneumatic control device, or after shutting down the machine by the operator. When it is turned off, the vent descends, and between it and the diaphragm a circular gap 5 mm wide is formed. The vent is a cone with a slope of about 30% The shot drops slowly through this gap but not pletely, and therefore it increases to t0 ram. The loading vents are alternately turned on by the control device. The first time the SM2 machine was repaired, it was discovered that the control device frequently did not operate because of corrosion of the parts. With normal charging of abrasive (375 kg according to the nameplate), blasting must be stopped after each alternate pass of the nozzles, since after another pass the shot in the lower partment is insufficient, and during blasting, With nonoperation of the control device, it does not drop from the upper partment to the lower. Delivery of the nextportion of shot must be done only after the operator disconnects the shot blast equipment from the air system. In this case both charging vents are opened, and the abrasive is fed to the lower partment. Continuous operation of the machine for three or four passes of the nozzles with nonoperation of the control device and the delivery of shot described above became possible after increasing t。机械专业毕业设计(论文)外文翻译---用抛丸清理机对板材轧辊进行抛丸处理(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。