机械专业外文翻译-木工机械的发展及特点(编辑修改稿)内容摘要:
is needed to ensure the accuracy of detection also depends on . There is no reliable test would be no modernization and automation, not to mention high efficiency and quality. In this annual meeting, the few articles about the new developments in assembly systems, in both papers stressed that in order to meet the needs of flexible automation, robot vision system must be able to install parts of the body and gestures to identify, should be installed There location and tactile sensors, precise positioning and grip force control, automatic guided vehicles should also be visual or acoustic emission sensors to detect moving obstacles may be encountered. In the Laser processing of sensor and surface roughness and surface morphology study two papers, is entirely in order to detect the main line to be discussed. In the Laser processing of sensor, a paper that Laser processing is a kind of blind process, which only processing one point, in order to obtain the required shape, and the need to control by detecting, laser processing is a kind of erosion process and its shape through sensors to detect and control. Laser processing has been able to achieve, the key lies in sensors. In this annual meeting, there are a number of papers have highlighted: the more flexible process, the more we need sensors. At present machinery manufacturing industry is characterized by the development of prehensive utilization of hightech industries in developed countries in many scholars and experts talk about the production process in the flexible, agile, intelligent, informationbased, they all pointed out that the machinery manufacturing engineers should master and prehensive utilization of engineering mathematics, laser science, laserelectronic technology, puter technology, cyberics, biology, materials science, management science, humanities and science, high technology, these science will change the face of the machinery manufacturing, and mechanical manufacturing technology it developed for these scientific provide new tools to further promote these scientific developments. The beginning of the 21st century, the general trend of the development of machinery industry The early 21st century, mechanical manufacturing industry overall development trends of the four modernizations: (1) Flexible: to make technical equipment and process routes can be applied to the production needs of a variety of products can be applied to the rapid replacement technology to replace the product needs。 (2) Agile: to make products to the market, and for the shortest lead time reduction, so that engineering works can be a flexible mechanism for steering。 (3) Intelligence: an important ponent of flexible automation, flexible automation is a new development and extension. Human beings should not only get rid of。机械专业外文翻译-木工机械的发展及特点(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。