机械专业外文翻译--手臂可调式捆包打结器(编辑修改稿)内容摘要:

d apertures 29,31 and th which wiper 21 is adjustably mounted. Fork 20 may be formed either by casting or forging and therefore is a strong, rigid ponent. Wiper 21, preferably of case hardened steel, is platelike and has a pair of slots 33, 35 corresponding in spacing to the threaded apertures 29,31 of boss 25. The profile of wiper 21 is conventional and has an arcuate recess or ledge 37. Wiper 21 is detachably mounted to fork 20 by a pair of screws 39,41 which pass through slots 33,35 and threadably engage apertues 29,31 so that fork 20 and wiper 21 are held tightly toghter. Wiper 21 is asjustable relative to fork 20 by moving wiper 21 back and forth in a plane parallel to the major planes of wiper 21 and in a direction parallel to the direction of elongation of slots 33,35 when screws 39,41 are loosened. Referring now to FIG. 3, wiper 21 is positioned closely to billhook 13 which ledge or recess 37 centered in relation to an outer surface or heel 43 of jaw 14. The maximum remended clearance between a first portion 43 of jaw 14 and ledge 37 is .. at the closest distance which jaw portion 45 approaches during rotation of billhook 13 during the formation of a twine knot. In contrast to the conventional integral wiper arm described in the Background of the Invention which requires modeling or bending of the wiper arm at positions corresponding to positions A,B and C shown in FIG. 2 in order to adjust the wiper with respect to the billhook for proper stripping of a twine loop from the billhook, the present embodiment of the invention achieves alignment simply and easily by adjustment of wiper 21 by loosening of screws 39,41 and sliding platelike wiper 21 back and forth. This permits fork 20 and wiper 21 to be deformable in use. In accordance with the features of a second embodiment of this invention, FIG. 4 shows a vertex 51 of a wiper arm 53 identical to wiper arm 17 except for the portion shown and descrobed in FIG. 4. shows a vertex 51 of a wiper arm 53 identical to wiper arm 17 except for the portion shown and described in FIG. 4. Wper arm 53 portion shown and described in FIG. 4. Wper arm 53includes a wiper 55 having first and second portions 57, 59 joined together at a right 55 is adjustably mounted to a major surface 61 of vertex 51 by an attachment means 63,here shown as a pair of bolts(only one of which— bolt 65— is visble in )inserted through apertu。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。