雅思高分备考技巧手册(编辑修改稿)内容摘要:

2 (Band ) • The bar graph demonstrates that the most UK visitors went to France and Spain, which were and million. Also, many British travelers were attracted by the USA( million), Greece( million) and Turkey( million). Chart 2 • The bar graph demonstrates that France and Spain were the favorite countries for UK tourists in 1999, which attracted around and million UK visitors respectively. Remotely following were the USA, Greece and Turkey with , and million travelers separately. Comparison (band ) • What is also worth mentioning is that almost 40% UK tourists selected France and Spain in 1999, if the two diagrams are considered as a whole. Comparison • What is also worth mentioning is that France and Spain alone accounted for almost 40 percent of UK tourists abroad in 1999, if the two diagrams are considered as a whole. Professional English • • • • • • thestreet TV Check • Sample Answer (I4 168) • Script • Comment – Script Corresponding Comment  TA  Under length  amp。 dollar  No parison  CC  No reference  LR amp。 GRA  Narrow sentence type  Basic errors I4 54  demand  used / need / requirement / consumption  typical  average / representative  use  consume  home  household / family  passive voice amp。 pound sentence Introduction The curve chart reveals electricity used in England during average days in winter and summer and how electricity is consumed in a typical English household is indicated in the pie graph. Read Chart 1 • Unit • hrs / yrs • o‟clock : am, . AM, • Number • 38,000 units Read Chart 2 • Everyday words • kettle • microwave oven • range hood Plan • Winter summer • Numbers : Max amp。 Min / Average • Winter, Summer : • Numbers : Max amp。 Min Words • peak / summit / highest point • nadir / touch the bottom / lowest point • unchanged / constant / stable / stationary phase Chart 1 (Band ) According to the curve chart, daily electricity need is higher in winter (38,000 units on average) than in summer (18,000 units on average). In winter, electricity consumption peaks at 2:00 am and 10:00 pm while it touches the bottom at 0:00 am and 8:00 am. On the other hand, in summer, it summits at 2:00 pm and 11:00 pm, but has a nadir at 9:00 am and a lower stationary phase from 4:00 pm to 9:00 pm. Chart 1 • According to the curve chart, daily electricity need is higher in winter (38,000 units on average) than in summer (18,000 units on average), although both of them are uneven during the day. In winter, electricity consumption peaks at 2:00 am and 10:00 pm while it touches the bottom at 0:00 am and 8:00 am. In contrast, the summer summits e later than winter ones at 2:00 pm and 11:00 pm. A nadir is seen nearly 9:00 am and a lower stationary phase is witnessed from 4:00pm to 9:00pm. occupy • be shared by • account for • be responsible for • be in charge of • be in the charge of Percentage • a small percentage of … (20%) • a quarter of … • the minority of … (40%) • half of … • the majority of … (60%) • three quarters of … • most of … (80%) • onefifth / onethird Structures  1 occupies / accounts for the majority of A (x%).  y% of A is shared by / is in the charge of 2.  3 and 4 are responsible for / in charge of the rest, with z% and w% respectively. Chart 2 (Band )  The pie graph demonstrates that heating rooms and water occupies the majority of electricity consumption(%). Then, % of the electricity de。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。