机械专业外文翻译--一种更加完善的三维设计工具软件(编辑修改稿)内容摘要:
d the project by drawing internal ponents in Pro/ENGINEER .Compad provided detailed Pro/E NGNEER parts used in its CFcard sleeve design .An initial assembly was used for subsequent configuration proposal . Configurations that passed specifications were printed in real size to serve as a modeling aid for preliminary foam mockups . Eventually one mockup passed the field tests and was used as the basis for the next design phase . The final configuration defined the optimal placement for the ponents . An outer casing tightly packed the ponents , leaving as little space as possible between the ponents and the casing .We started with the Advanced Surface Extension (ASX) module of Pro/ENGNEER 2020i2 , but it soon became clear that to design the bounding surfaces with more freedom , a plete freeform design solution was needed .The dynamic aspect of design and the plex surface transitions (especially in the hand grip area and the transition from sleeve to casing ) required a more flexible and powerful tool. Taking a Test Drive A local reseller offered two solutions : CDRS and ISDX .While CDRS is an industryproven solution for drawing Aclass surfaces ,it is a seperate application that would have forced us to learn to work in an entirely new environment .In addition ,we anticipated that frequently shifting from one application to another , even if well implemented through the 5 ATB , would slow down design process. Coincidentally , a preproduction version of Pro/ENNGNEER 2020 was shipping at the time . This version included a new feature called the style feature . This interactive surface design extension or ISDX arrived just in time . Although still in preproduction ,ISDX had the same stability and roubstness as Pro/ENGNEER Foundation . After a short training period ,Pars pro toto began using ISDX。 we were the first in Europe to apply this feature in an industrial design project . Design time was significantly shortened because changes were reflected immediately in the model . ISDX also helped us draw the intricate curvature continuous curves needed for the plex surface transitions. The clearance between the ponents and the surface envelope was observed at all times to ensure that material thickness was sufficient and tight around the ponents. Concurrent En。机械专业外文翻译--一种更加完善的三维设计工具软件(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。