有关绝缘材料中英对照翻译-材料科学(编辑修改稿)内容摘要:
vice. Although insulating materials are very stable under ordinary circumstances, they may change radically in characterstics under extreme conditions of voltage stress or temperature or under the action of certain changer may, in local regions, result in the insulating material being highly current flow brings about intense heating and the rapid destruction of the insulating insulation failures account for a high percentage of the equipment troubles on electric power selection of proper materials, the choice of proper shapes and dimensons and the control of destructive agencies are some of the problems of the insulationsystem designer. Insulating Materials Many different materials are used as insulation on electricpower choice of material is dictated by the requi。有关绝缘材料中英对照翻译-材料科学(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。