托福真题全集(编辑修改稿)内容摘要:
(A) both (B) came (C) did (D) when 15. 200 bones forming the framework, or skeleton, of the human body. (A) Being over (B)There are over (C) Where over (D)Over 16. The world39。 s water balance is regulated by the constant circulation of water in A B C Liquid and vapor tom among the oceans, the atmospheric, and the land. 8 D 17. The major purpose of the United States Department of Education are to ensure A equal educational opportunity for all and to improve the quality of education. B C D 18. Massive gains in puter speed, power, and reliably have been largely due A B C to advances in silicon tec~logics and manufacturing processes. D 19. The sunflower, the official state flower of Kansas, and is widespread in A B the prairies of the western United States. C D 20. Lake Superior, part of the United StatesCanadian boundary, is a largest A B C freshwater lake in the world. D 21. The snapper, a largeheaded fish with a long dorsal fin, is named to its A B characteristic way of suddenly, shutting its mouth. C D 22. The aim of the decorative arts is to beautiful our surroundings. A B C D 23. Modern digital synthesizers, based on microprocessors, are virtually unlimited A B in the number and range of musical sounds it can produce. C D 24. During the years he posed, Charles Ives was isolation from the music world。 A B none of his major works was publicly performed. C D 25. Psychoanalysis is a form of therapy that attempts to eliminate conflict by alter the A B C personality in a positive way. D 26. Globally, the 199039。 s stood out as the warmest decade for what we have weather A B C D records. 27. Silicon chips are reliable and cheap to produce in large numbers and are A used them in puters, calculators, programmed household appliances, and B C most electronic applications. 9 D 28. Because its pitch cannot easily be altered, the oboe serves as the standard A B which by the symphony orchestra is tuned. C D 29. Bursae are fluidfilled sacs that form cushions between tendons and bones and A B C protect them while movement. D 30. In 1916, United States suffragist Alice Paul founded the National Woman, s Patty, A a political party dedicate to establishing equal rights for women. B C D 31. The spice cinnamon and the drugs cascara and quinine all e from bark, the A protective out layer of stems and roots of woody plants. B C D 32. Tunas migrate long distances over all the world39。 s oceans and occupy tropical, A B C temperate, and even some the cooler waters. D 33. Taste buds, small sensory an located on the tongue and palate, recognize four A B primary tastes: sweet, sour, salty and bitter. C D 34. Astronauts receive extensive training to prepare themselves both physically and A B C psychologically for plexity and rigor of a space mission. D 35. By 1900 several prominent technical institutions, including the Massachusetts A Institute of Technology, fashioned its own educational offerings to meet the B C industrial needs of the United States. D 36. Some of the earliest mechanical devices were designed to raise water from A B C streams for the irrigate of crops. D 37. The Louisiana Purchase of 1803 increased the territory of the United States A by approximate 846,000 square miles, practically doubling the area of the B C D 10 United States. 38. A most useful tool for analyzing the elemental position of fossils is the A B C electron probe, a modify electron microscope. D 39. Few substance on Earth equal the beauty of gemstones such as twinkling A B C diamonds, green emeralds, red rubies, blue sapphires, and multicolored opals. D 40. For the purposes of the fine and decorative arts, metals have been used either in A B C their simple state and in unplicated alloys. D Section Three: Reading Comprehension Question 110 After 1785, the production of children39。 s books in the Untied States increased but remained largely reprints of British books, often those published by John Newbery, the first publisher to produce books aimed primarily at diverting a child audience. Ultimate]y, Line however, it w。托福真题全集(编辑修改稿)
相关推荐
好 标准化操作是做好的保证 执行就是在训练在企业的生存本领 . 狼 只吃肉 .也只能吃肉 . 产品聚焦 客户聚焦 问题聚焦 产品如何聚焦 ? 瘦狗类 金牛类 问题类 明星类 客户如何聚焦 ? 保留 追踪 聚焦 聚焦 砍掉 问题如何聚焦 ? 泛 :20% 与 :80% 复杂 简单 流程 框式 吾亦无他 ,唯手熟尔 ! 画画不唰歌 五 .打造高效团队
⑵ 若对任意实数 a , 0)2( f 恒成立,求实数 b 的取值范围; ⑶ 设 b 为 常 数,解关于 a 的不等式 0)1( f . 育星教育网 丰富的资源 最快的更新 优质的服务 诚信的运作 3 / 6 参考答案: 一、填空题 1. 32 2. 2 7 0xy 3. 17 4. 212a 5. 120 6. 70xy 或 2 5 0xy 7. ( 1)
10. 大盘这么差,做股票是没有钱赚的。 答:您不用担心,大盘不好不影响个股的上升,您看每天还是有涨停的股票啊。 您再看大盘走的不好,而我们推的股票也是走的不错啊。 大盘好,我们的会员就赚的更多。 大盘不好,我们也能赚 34个点呢。 (根据客户当天问的时间看我们公司推的股票的点位告诉客户,再告诉客户我们近期操作股票累计点数 ) /她的电话:还有为何事情给他 /她电话: 3 答
度的 1/10(长度小于 20mm 的不计),每块板允许条数(条) 色斑 面积 不超过 15mm 30mm(面积小于 10mm10mm 不计),每块板允许个数(个) 2 3 色线 长度不超过两端顺延至板边总长度的 1/10(长度小于 40mm 的不计),每块板允许条数(条) 注:干挂板材不允许有裂纹存在。 二、主要机具 1 测量工具 测厚仪、铅垂仪、激光经纬仪、经纬仪、水平仪、钢卷尺、水平尺
钱。 原价¥ 18元 圣诞节来临 ,所有商品九折出售 . 便宜了多少钱。 原价¥ 18元 把标价签补充完整 产品名称:书包 等级: 一级 原价: 40元 现价: 36元 折扣: ( )折 原因: 店庆 产品名称:电磁炉 等级: 优 原价: 420 元 现价: ( )元 折扣: 七折 原因: 促销 294 九 把标价签补充完整 • 产品名称:皮鞋 • 等级:
对 要克服这种心理障碍。 其二: 在领导传达某项决策意向或工作时, 用笔记录任务要点 ,要细心,不要忘记。 其三: 及时 向上级确认,如有疏漏或有理解错误的地方请上级做出补充。 ◆ 四大方式提高 执行力 执行力水平的提高,不仅仅光靠自身能力基础 就够了,还得 改善自己的工 作方法,许多人在做工作时往往是采取“拍脑袋”“凭感觉”等方式去做, 或者遇到需要沟通和协调时,不去沟通或不懂得沟通和协调