c_常见英文面试笔试题(编辑修改稿)内容摘要:
t class? When you define only function prototype in a base class without implementation and do the plete implementation in derived class. This base class is called abstract class and client won39。 t able to instantiate an object using this base class. You can make a pure virtual function or abstract class this way.. class Boo { void foo() = 0。 } Boo MyBoo。 // pilation error What is Memory alignment?? The term alignment primarily means the tendency of an address pointer value to be a multiple of some power of two. So a pointer with two byte alignment has a zero in the least significant bit. And a pointer with four byte alignment has a zero in both the two least significant bits. And so on. More alignment means a longer sequence of zero bits in the lowest bits of a pointer. What problem does the namespace feature solve? Multiple providers of libraries might use mon global identifiers causing a name collision when an application tries to link with two or more such libraries. The namespace feature surrounds a library39。 s external declarations with a unique namespace that eliminates the potential for those collisions. namespace [identifier] { namespacebody } A namespace declaration identifies and assigns a name to a declarative region. The identifier in a namespace declaration must be unique in the declarative region in which it is used. The identifier is the name of the namespace and is used to reference its members. What is the use of 39。 using39。 declaration? A using declaration makes it possible to use a name from a namespace without the scope operator. What is an Iterator class? A class that is used to traverse through the objects maintained by a container class. There are five categories of iterators: input iterators, output iterators, forward iterators, bidirectional iterators, random access. An iterator is an entity that gives access to the contents of a container object without violating encapsulation constraints. Access to the contents is granted on a oneatatime basis in order. The order can be storage order (as in lists and queues) or some arbitrary order (as in array indices) or according to some ordering relation (as in an ordered binary tree). The iterator is a construct, which provides an interface that, when called, yields either the next element in the container, or some value denoting the fact that there are no more elements to examine. Iterators hide the details of access to and update of the elements of a container class. Something like a pointer. What is a dangling pointer? A dangling pointer arises when you use the address of an object after its lifetime is over. This may occur in situations like returning addresses of the automatic variables from a function or using the address of the memory block after it is freed. What do you mean by Stack unwinding? It is a process during exception handling when the destructor is called for all local objects in the stack between the place where the exception was thrown and where it is caught. Name the operators that cannot be overloaded?? sizeof, ., .*, ., ::, ?: What is a container class? What are the types of container classes? A container class is a class that is used to hold objects in memory or external storage. A container class acts as a generic holder. A container class has a predefined behavior and a wellknown interface. A container class is a supporting class whose purpose is to hide the topology used for maintaining the list of objects in memory. When a container class contains a group of mixed objects, the container is called a heterogeneous container。 when the container is holding a group of objects that are all the same, the container is called a homogeneous container. What is inline function?? The __inline keyword tells the piler to substitute the code within the function definition for every instance of a function call. However, substitution occurs only at the piler39。 s discretion. For example, the piler does not inline a function if its address is taken or if it is too large to inline. What is overloading?? With the C++ language, you can overload functions and operators. Overloading is the practice of supplying more than one definition for a given function name in the same scope. Any two functions in a set of overloaded functions must have different argument lists. Overloading functions with argument lists of the same types, based on return type alone, is an error. What is Overriding? To override a method, a subclass of the class that originally declared the method must declare a method with the same name, return type (or a subclass of that return type), and same parameter list. The defi。c_常见英文面试笔试题(编辑修改稿)
相关推荐
资金,筹借资金 finished goods n. 制成品 firm n. 公司 fire v. 解雇 fix v. 确定,使固定在 fix up v. 解决,商妥 fiscal adj. 国库的,财政的 *flagship n. 同类中最成功的商品,佼佼者 flexible adj. 有弹性的,灵活的 flextime n. 弹性工作时间制 flier(=flyer) n. 促销传单
事物应用的单个帐号。 帐号可以为多种类型,但是至少包括支票和存款。 每个顾客可以拥有多个帐号。 客户:拥有银行的一个或多个帐号的人。 可以是一个人或多个人,或者是公司。 相同的人,拥有不同的银行帐号被 认为是不同的落户。 ATM: ATM 是 Automatic Teller Machine 的缩写,意为自动柜员机。 是一种高度精密的机电一体化设备,利用磁卡或智能 IC
g: how to ensure that agents maintain a high level of effectiveness when representing a pany 4. Time Management: the importance of planning work time effectively 5. Project Development: how to ensure
:a 数据已经增加 . Menu: A(dd) D(elete) S(ort) Q(uit), Select one:d 数据已经删除 . Menu: A(dd) D(elete) S(ort) Q(uit), Select one:s 数据已经排序 . Menu: A(dd) D(elete) S(ort) Q(uit), Select one:q ( 2)实现一个简单的菜单程序,运行时显示
配件开发以及相关产品 检验标准之确定等工作。 6 业务部 部长 负责与客户之信息沟通,协调与客户的关系等工作。 7 人事部 部长 负责组织项目开发人员的培训等工作。 8 财务部 部长 负责核算新产品的成本和项目开发成本等工作。 项目组长: 管理者代表: 总经理: 表单编号:
上大学不要钱; 当我们上大学的时候,读小学不要钱; 当我们没能工作的时候,工作是分配的; 我们可以工作的时候,要撞到头破血流才勉强找到一份饿不死的工作; 当我们不能工作的时候,房子是分配的; 当我们能挣钱的时候,房子已经买不起了; 当我们没有进入股市的时候,傻瓜都能挣钱; 当我们兴冲冲闯入的时候,却发现自己才是傻瓜; 当我们没到结婚年龄的时候,骑单车就能娶媳妇; 当我们到了结婚年龄的时候