数控车床外文翻译3-数控设计(编辑修改稿)内容摘要:

wn time . This problem led to the development of puter numerical control. The development of the microprocessor allowed for the development of programmable logic controllers (PLC) and microputers . These two technologies allowed for the development of puter numerical control (CNC).With CNC , each machine tool has a PLC or a microputer that serves the same purpose. This allows programs to be input and stored at each individual machine tool. CNC solved the problems associated downtime of the host puter , but it introduced another problem known as data management . The same program might be loaded on ten different microputers with no munication among them. This problem is in the process of being solved by local area works that connectDigital Signal Processors The most important of these was that it was difficult or impossible to change the instructions entered on the tape. To made even the most minor adjustments in a program of instructions, it was necessary to interrupt machining operations and make a new tape. It was also still necessary to run the tape through the reader as many times as there were parts to be produced. Fortunately, puter technology became a reality and soon solved the problems of NC associated with punched paper and plastic tape. The development of a concept known as direct numerical control (DNC) solved the paper and plastic tape problems associated with numerical control by simply eliminating tape as the medium for carrying the programmed instructions. In direct numerical control, machine tools are tied, via a data transmission link, to a host puter. Programs for operating the machine tools are stored in the host puter and fed to the machine tool an needed via the data transmission linkage. Direct numerical control represented a major step forward over punched tape and plastic tape. However, it is subject to the same limitations as all technologies that depend on a host puter. When the host puter goes down, the machine tools also experience downtime. This problem led to the development of puter numerical control. There are numerous situations where analog signals to be processed in many ways, like filtering and spectral analysis , Designing analog hardware to perform these functions is possible but has bee less and practical, due to increased performance requirements, flexibility needs , and the need to cut down on development/testing time .It is in other words difficult pm design analog hardware analysis of signals. The act of sampling an signal into thehat are specialised for embedded signal processing operations , and such a processor is called a DSP, which stands for Digital Signal Processor . Today there are hundreds of DSP 第 页 共 12 页 families from as many manufacturers, each one designed for a particular price/performance/usage group. Many of the largest manufacturers, like Texas Instruments and Motorola, offer both specialised DSP’ s for certain fields like motorcontrol or modems ,and general highperformance DSP’s that can perform broad ranges of processing tasks. Development kits an` software are also available , and there are panies making software development tools for DSP’ s that allows the programmer to implement plex processing algorithms using simple “ drag ‘ n’ drop” methodologies. DSP’ s more or less fall into two categories depending on the underlying architecturefixedpoint and floatingpoint. The fixedpoint devices generally operate on 16bit words, while the floatingpoint devices operate on 3240 bits floatingpoint words. Needless to say , the fixedpoint devices are generally cheaper . Another important architectural difference is that fixedpoint processors tend to have an accumulator architecture, with only one “ general purpose” register , making them quite tricky to program and more importantly ,making Cpilers inherently inefficient. Floatingpoint DSP’ s behave more like mon generalpurpose CPU’ s ,with registerfiles. There are thousands of different DSP’ s on the market, and it is difficult task finding the most suitable DSP for a project. The best way is probably to set up a constraint and wishlist, and try to pare the processors from the biggest manufacturers against it. Digitaltoanalog conversion In the case of MPEGAudio decoding , digital pressed data is fed into the DSP which performs the decoding , then the decoded samples have to be converted back into the analog domain , and the resulting signal fed an amplifier or similar audio equipment . This digital to analog conversion。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。