数控机床中英文翻译资料-数控设计(编辑修改稿)内容摘要:
could operate only a few minutes without a tube failing. In addition, the puter weighed many tons and was very difficult to program. ENIAC was programmed through the use of thousands of switches. The $15 calculator available today is much more powerful than this early attempt. The real turning point in puter technology was the invention of the transistor in 1948. The transistor was the replacement for the vacuum tube. It was very small, cheap, dependable, used very little power, and generated very little heat: the perfect replacement for the vacuum tube. The transistor did not see much industrial use until the 1960s. INTEGRATED CIRCUITRY In 1959 a new technology emerged: integrated circuits (ICs). Integrated circuits were actually control circuits on a chip. When manufacturers discovered how to miniaturize circuits, it helped reduce the size and improve the dependability of electronic control even more than the transistor had. Largescale integrated circuits first were produced in 1965. In 1974 the microprocessor was invented. This made the microputer, and thus small application, possible. Great strides in the manufacture of memory for puters helped make puters more powerful and affordable. The original conception of numerically controlled machine tools occurred in the 1950s as a method of producing airfoils of great accuracy for the government. These plex parts were made by manual machining methods and inspected by paring them to templates. The templates also had to be manufactured by manual methods, which was very time consuming and inaccurate. However, in a shop in Traverse City, Michigan, a man named John Parsons was working on a method to improve the production of inspection templates for helicopter rotor blades. Parsons started as a。数控机床中英文翻译资料-数控设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。