数控技术外文翻译-数控设计(编辑修改稿)内容摘要:

mon form, the mands refer to positions of a machine tool spindle with respect to the worktable on which the part is fixed. More advanced instructions include selection of spindle speeds, cutting tools, and other functions. 黄石理工学院 毕业设计(论文)外文文献翻译 5 The machine control unit (MCU) consists of the electronics and control hardware that reads and interprets the program of instructions and convert it into mechanical actions of the machine tool or other processing equipment. The processing equipment is the ponent that performs metal process. In the most mon example of numerical control, it is used to perform machining operations. The processing equipment consists of the workable and spindle as well as the motors and controls needed to drive them. Types of NC There are two basic types of numerical control systems: point to point and contouring. Point to point control system, also called positioning, are simpler than contouring control system. Its primary purpose is to move a tool or workpiece from one programmed point to another. Usually the machine function, such as a drilling operation, is also activated at each point by mand from the NC program. Point to point system are suitable for hole machining operations such as drilling, countersinking, counterboring, reaming, boring and tapping. Hole punching machines, spotwelding machines, and assembly machines also use point to point systems. Contouring system, also known as the continuous path system, positioning and cutting operations are both along controlled paths but at different velocities. Because the tool cuts as it travels along a prescribed path, accurate control and synchronization of velocities and movements are important. The contouring system is used on lathes, milling machines, grinders, welding machinery, and machining centers. Movement along the path, or interpolation, occurs incrementally, by one of several basic methods. There are a number of interpolation schemes that have been developed t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。