数控外文翻译---数控技术发展趋势-数控设计(编辑修改稿)内容摘要:
different directions view and partial display ratio scaling function can be achieved. (2) visualization in scientific puting visualization in scientific puting can be used for efficient data processing and interpretation of data, so that the exchange of information is no longer limited to using the written word and language, and can direct the use of graphics, image, animation, video and other information. Visualization technology and virtual environment technology, to further broaden the application areas, such as a drawing design, virtual prototyping technology, which shorten product design cycles, improving product quality, reduce production cost is of great significance. NC technology in the areas of visualization technology can be used for CAD / CAM, such as automatic programming design parameters automatically set, tool pensation and tool management of dynamic data processing and display, as well as the processing of visual simulation, and other presentations. (3) interpolation, and a variety of methods of pensation interpolation methods such as multiple linear interpolation, circular interpolation, cylindrical interpolation, space elliptical surface interpolation, thread interpolation, polar coordinates interpolation, 2 D +2 helical interpolation , NANO interpolation, interpolation NURBS (nonuniform rational Bspline interpolation), spline interpolation (A, B, C kind), such as polynomial interpolation. A variety of functions such as pensation gap pensation vertical pensation quadrant error pensation, and measurement systems pitch error pensation, and speedrelated feedforward pensation and temperature pensation, with nearly smooth and exit, as well as the opposite point of the cutter radius pensation. (4) highperformance PLC contents contents performance CNC system PLC control module can be directly used ladder diagram or highlevel language programming, with intuitive online debugging and online help function. Programming tools include the standard used lathe and milling machine PLC user program an example, users may PLC user program standards on the basis of editorial changes, thus easily build their own applications. (5) application of multimedia technology of multimedia technologyputers, audiovisual and munication technology, and it has the puter integrated voice, text, images and video information. In NC technology, multimedia technology can be applied to information processing integrated, intelligent, realtime monitoring system in the field and production equipment fault diagnosis, monitoring of process parameters such as production has a significant value. Development of the Architecture (1) integration of a highly integrated CPU, programmable RISC chips and largescale integrated circuits FPGA, EPLD, CPLD and ASIC ASIC chips that can improve the CNC system integration and hardware and software operating speed. Application FPD flat panel display technology can improve display performance. Flatpanel displays with high science and technology content, light weight, small size, low power consumption and portability advantages can be realized Supersized, a counterweight to the emerging and CRT display technology, display technology in the 21st century the mainstream. Applica。数控外文翻译---数控技术发展趋势-数控设计(编辑修改稿)
相关推荐
两学一做论文 1 / 4论世界格局演变趋势摘要:当今世界,国际局势似乎也变得甚为微妙,有点“牵一发,而动全身”的态势。 总体来看,国际上以美、日、俄、中和欧洲诸国为主轴,在历史和国际竞争的舞台上,任何两国都在为自己的利益进行着政治、经济等方面的角逐与对垒。 “和平与发展”仍是当今时代的主题。 “世界多极化”和“经济全球化”在曲折中继续发展。 总体和平、局部战争,总体缓和、局部紧张,总体稳定
r. Japan carries the technological research association first to classify it as one of the 5 great modern manufacturing technologies for this, learn (CIRP) to confirm it as the centre in the 21st
7 加工出合格的零件,首先要对该 零件图 纸 进行分析,如上图所示,该零件是由螺纹、圆柱、圆弧、 椭圆弧、 槽等表面组成,总长度为 100mm,其中有较严格的直径尺寸精度要求如 mm 、 mm mm 、 mm, 轴线长度的精度如 40mm、 mm。 粗糙度要求槽面 、 其他表面为。
reduce large scale, numerical control system price disparity reduction. Therefore promoted the pound host axle neck type 5 axis linkage engine bed and the pound processing engine bed (including 5
涵盖了在参数空间的充分单位正方形 [16],因此,希尔伯特的曲线填补三维表面进行抛光。 希尔伯特 曲线可以用递归算法定义。 n阶曲线定义如下: 一二三阶希尔伯特曲线如下图(图 5)所示 为了保持沿着希尔伯特曲线相切的连续性,是指导摆线刀具路径的曲线,我们决定对鱼片的角落抛光分形。 否则,在每分形曲线,抛光方向的改变刀具路径将是不连续的。 造成希尔伯特曲线描绘在图 6。 基于 在此表示
加工 50~ 70 ~ YG 类 精加工 70~ 100 ~ 切断(宽度< 5mm) 50~ 70 ~ 此外,在安排粗、精车削用量时,应注意机床说明书给定的允许切削用量范围,对于主轴采用交流变频调速的数控车床,由于主轴在低转速时扭矩降低,尤其应注意此时的切削用量选择。 对刀点与换刀点的确定 工件装夹方式确定后,即可通过确定工件原点来确定工件坐标系。 如果要运行这一程序来加工工件