数控加工外文翻译--数控加工中心技术发展趋势及对策-数控设计(编辑修改稿)内容摘要:
ive power. Japan carries the technological research association first to classify it as one of the 5 great modern manufacturing technologies for this, learn (CIRP) to confirm it as the centre in the 21st century and study one of the directions in international production engineering. In the field of car industry, produce one second when beat such as production of 300,000 / vehicle per year, and many variety process it is car that equip key problem that must be solved one of。 In the fields of aviation and aerospace industry, spare parts of its processing are mostly the thin wall and thin muscle, rigidity is very bad, the material is aluminium or aluminium alloy, only in a situation that cut the speed and cut strength very small high, could process these muscles, walls. Adopt largescale whole aluminium alloy method that blank pay empty make the wing recently, such largescale parts as the fuselage ,etc. e to substitute a lot of parts to assemble through numerous rivet , screw and other connection way, make the intensity , rigidity and dependability of the ponent improved. All these, to processing and equipping the demand which has proposed highspeed, high precise and high flexibility. According to EMO2020 exhibition situation, highspeed machining center is it give speed can reach 80m/min is even high , air transport petent speed can up to 100m/min to be about to enter. A lot of automobile factories in the world at present, including Shanghai General Motors Corporation of our country, have already adopted and substituted and made the lathe up with the production line part that the highspeed machining center makes up. HyperMach lathe of . CINCINNATI Company enters to nearly biggest 60m/min of speed, it is 100m/min to be fast, the acceleration reaches 2g, the rotational speed of the main shaft has already reached 60 000r/min. Processing a thin wall of plane parts, spend 30min only, and same part general at a high speed milling machine process and take 3h, the ordinary milling machine is being processed to need 8h。 The speed and acceleration of main shaft of dual main shaft lathes of Germany DMG Company are up to 120200r/mm and 1g. In machining accuracy, the past 10 years, ordinary progression accuse of machining accuracy of lathe bring 5μm up to from 10μm already, accurate grades of machining center from 3~ 5μm, rise to 1~ , and ultraprecision machining accuracy is it enter nanometer grade to begin already (). In dependability, MTBF value of the foreign numerical control device has already reached above 6 000h, MTBF value of the servo system reaches above 30000h, demonstrate very high dependability . In order to realize highspeed, high finish machining, if the part of function related to it is electric main shaft, straight line electrical machinery get fast development, the application is expanded further . Link and process and pound to process the fast development of the lathe in 5 axes Adopt 5 axles to link the processing of the threedimensional curved surface part, can cut with the best geometry form of the cutter , not only highly polished, but also efficiency improves by a large margin . It is generally acknowledged, the efficiency of an 5 axle gear beds can equal 2 3 axle gear beds, is it wait for to use the cubic nitrogen boron the milling cutter of ultra hard material is milled and pared at a high speed while quenching the hard steel part, 5 axles link and process 3 constant axles to link and process and give play to higher benefit. Because such reasons as plicated that 5 axles link the numerical control system , host puter structure that but go over, it is several times higher that its price links the numerical control lathe than 3 axles , in addition the technological degree of difficulty of programming is relatively great, have restricted the development of 5 axle gear beds. At present because of electric appearance of main shaft, is it realize 5 axle plex main shaft hair structure processed to link greatly simplify to make, it makes degree of difficulty and reducing by a large margin of the cost, the price disparity of the numerical control system shrinks. So promoted 5 axle gear beds of head of plex main shaft and pound to process the development of the lathe (process the lathe including 5). At EMO2020 exhibition, new Japanese 5 of worker machine process lathe adopt plex main shaft hair, can realize the processing of 4 vertical planes and processing of the wanton angle, make 5 times process and 5 axles are processed and can be realized on the same lathe, can also realize the inclined plane and pour the processing of the hole of awls. Germany DMG Company exhibits the DMUVoution series machining center, but put and insert and put processing and 5 axles 5 times to link and process in once, can be controlled by CNC system or CAD/CAM is controlled directly or indirectly. Bee the main trend of systematic development of contemporary numerical control intelligently, openly, workedly. The numerical control equipment in the 21st century will be sure the intelligent system, the intelligent content includes all respects in the numerical control system: It is intelligent in order to pursue the efficiency of processing and process quality, control such as the selfadaptation of the processing course, the craft parameter is produced automatically。 Join the convenient one in order to improve the performance of urging and use intelligently, if feedforward control , adaptive operation , electrical machinery of parameter , discern load select models , since exactly makes etc. automatically。 The ones that simplified programming , simplified operating aspect are intelligent, for instance intelligent automatic programming , intelligent manmachine interface ,etc.。 There are content of intelligence。数控加工外文翻译--数控加工中心技术发展趋势及对策-数控设计(编辑修改稿)
相关推荐
论文格式及标准字体格式 云南农业大学成人高等教育专本科生毕业论文(设计)撰写规范(仅供参考)一、毕业论文的文本结构1封面2摘要3关键词4主体部分5参考文献6致谢二、毕业论文的内容要求(一)前置部分1封面见毕业论文格式一2摘要摘要是毕业论文内容及结论的简明概述,具有独立性和自含性。 其内容应说明论文的主要内容、研究方法、结果、结论和意义等。 必须重点突出,文 字精 练。 摘 要 以 300500
加工 50~ 70 ~ YG 类 精加工 70~ 100 ~ 切断(宽度< 5mm) 50~ 70 ~ 此外,在安排粗、精车削用量时,应注意机床说明书给定的允许切削用量范围,对于主轴采用交流变频调速的数控车床,由于主轴在低转速时扭矩降低,尤其应注意此时的切削用量选择。 对刀点与换刀点的确定 工件装夹方式确定后,即可通过确定工件原点来确定工件坐标系。 如果要运行这一程序来加工工件
涵盖了在参数空间的充分单位正方形 [16],因此,希尔伯特的曲线填补三维表面进行抛光。 希尔伯特 曲线可以用递归算法定义。 n阶曲线定义如下: 一二三阶希尔伯特曲线如下图(图 5)所示 为了保持沿着希尔伯特曲线相切的连续性,是指导摆线刀具路径的曲线,我们决定对鱼片的角落抛光分形。 否则,在每分形曲线,抛光方向的改变刀具路径将是不连续的。 造成希尔伯特曲线描绘在图 6。 基于 在此表示
旅游项目规划论文 浅论煤矿塌陷区湿地资源的整合与旅游开发文主要概括的规划了河南省永城市境内旅游资源及煤矿塌陷区整合后的利用开发,使塌陷区废水变碧水,改建成为具有国内一流的以养生为主的湿地生态休闲度假区,并利用当地的地热资源建造以汉文化为主题的温泉度假村。 关键词:旅游资源 湿地 养生生态度假区 汉文化 一、城市文化背景永城人文荟萃,物华天宝,历史文化资源丰富。 境内有淮海战役陈官庄烈士陵园
), form the serration, and can use users specially conveniently and the technical knowhow is integrated in the control system, realize the open numerical control system of different variety ,
C systems. The coded instructions on the tape consist of sections of punched holes called blocks. Each block represents a machine function, a machining operation, or a bination of the two. The entire