数控专业毕业设计外文翻译--数控-数控设计(编辑修改稿)内容摘要:

er peripherals to create an ideal solution for control system applications. The following characteristics make the TMS320 family the right choice for a wide range of processing applications: Very flexible instruction set Inherent operational flexibility Highspeed performance Innovative parallel architecture Cost effectiveness Devices within a generation of the TMS320 family have the same CPU structure but different onchip memory and peripheral configurations. Spinoff devices use new binations of Onchip memory and peripherals to satisfy a wide range of needs in the worldwide electronics market. By integrating memory and peripherals onto a single chip , TMS320 devices reduce system costs and save circuit board space. The 16bit ,fixedpoint DSP core of the „C24x devices provides analog designers a digital solution that does not sacrifice the precision and performance of their system performance can be enhanced through the use of advanced control algorithms for techniques such as adaptive control , Kalman filtering , and state control. The „C24x DSP controller offer reliability and programmability . Analog control systems, on the other hand ,are hardwired solutions and can experience performance degradation due to aging , ponent tolerance, and drift. The highspeed central processing unit (CPU) allows the digital designer to process algorithms in real time rather than approximate results with lookup tables. The instruction set of these DSP controllers, which incorporates both signal processing instructions and generalpurpose control functions, coupled with the extensive development time and provides the same ease of use as traditional 8and 16bit microcontrollers. The instruction set also allows you to retain your software investment when moving from other generalpurpose„C2xx generation ,source code patible with the‟C2x generation , and upwardly source code patible with the „C5x generation of DSPs from Texas Instruments. The „C24x architecture is also wellsuited for processing control signals. It uses a 16bit word length along with 32bit registers for storing intermediate results, and has two hardware shifters available to scale numbers independently of the CPU . This bination minimizes quantization and truncation errors, and increases p2ocessing power for additional functions. Such functions might include a notch filter that could cancel mechanical resonances in a system or an estimation technique that could eliminate state sensors in a system. The „C24xDSP controllers take advantage of an set of peripheral functions that allow Texas Instruments to quickly configure various series members for different price/ performance points or for application optimization. This library of both digital and mixedsignal peripherals includes: Timers Serial munications ports (SCI,SPI) Analogtodigital converters(ADC) Event manager System protection, such as lowvoltage and watchdog timer The DSP controller peripheral library is continually growing and changing to suit the of tomorrow‟s embedded control marketplace. The TMS320F/C240 is the first standard device introduced in the „24x series of DSP controllers. It sets the standard for a singlechip digital motor controller. The „240 can execute 20 MIPS. Almost all instructions are executed in a simple cycle of 50 ns . This high performance allows realtime execution of very ple8 control algorithms, such as adaptive control and Kalman filters. Very high sampling rates can also be used to minimize loop delays. The „ 240 has the architectural features necessary for highspeed signal processing and digital control functions, and it has the peripherals needed to provide a singlechip solution for motor control applications. The „240 is manufactured using submicron CMOS technology, achieving a log power dissipation rating . Also included are several powerdown modes for further power savings. Some applications that benefit from the advanced processing power of the „240 include: Industrial motor drives Power inverters and controllers Automotive systems, such as electronic power steering , antilock brakes, and climate control Appliance and HVAC blower/ pressor motor controls Printers, copiers, and other office products Tape drives, magic optical drives, and other mass storage products Robotic and CNC milling machines To function as a system manager, a DSP must have robust onchip I/O and other peripherals. The event manager of the „240 is unlike any other available on。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。