20xx届高考总复习跟踪测评i(编辑修改稿)内容摘要:

the 7 without stopping. After a little while a middleaged man stood near the wall to 8 him, but in a few minutes the man looked at his watch. He would be late 9 he must go. The one who paid the most 10 was a threeyearold boy. Finally his mother pulled 4 him hard and the child 11 to walk. This 12 was repeated by several other children. All the parents, without exception, 13 them to move on. In the 45 minutes the violinist played, only 6 people stopped and stayed for a while and 20 people gave him money. He 14 $32. When he finished playing, the station became 15 , but no one noticed it. The violinist felt 16 very much. No one knew this was Joshua Bell, one of the best 17 in the world. Two days before his playing in the station, Joshua Bell 18 all the tickets at a theatre in Boston. There was no empty seat and the seats average $ each. Do we sense beauty? Do we stop to enjoy it? 19 we do not have a moment to stop and listen to one of the best musicians in the world playing the best music, how many other things are we 20 ? 1. A. wrote B. danced C. sang D. played 2. A. Before B. During C. After D. By 3. A. went back B. came across C. passed through D. ran over 4. A. noticed B. announced C. showed D. dreamed 5. A. carefully B. sadly C. lazily D. slowly 6. A. received B. found C. lost D. gave 7. A. bag B. box C. pool D. hole 8. A. wait for B. talk with C. listen to D. look for 9. A. or B. but C. so D. as 10. A. money B. attention C. rent D. cost 11. A. stopped B. appeared C. wanted D. continued 12. A. music B. action C. suggestion D. question 13. A. forced B. advised C. invited D. refused 14. A. borrowed B. asked C. collected D. begged 15. A. beautiful B. dangerous C. clean D. quiet 16. A. disappointed B. happy 5 C. fortable D. excited 17. A. teachers B. musicians C. businessmen D. drivers 18. A. packed away B. handed over C. picked out D. sold out 19。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。