数控专业毕业设计外文翻译----中国数控车床的现状和发展趋势分析-数控设计(编辑修改稿)内容摘要:
l engine bed product quality crucial does the numerical control engine bed display its high performance, the high accuracy and the high efficiency, and obtains the good benefit, the key is decided by its reliable height. 3. function rebine function rebine goal is further enhances the engine bed the production efficiency, uses reduces to few in the nonprocessing noncutting the function rebine, may expand the engine bed the use scope, enhances the efficiency, realizes multipurpose one machine, one machine many energy, namely a numerical control lathe already may realize the turning function, also may realize the milling processing。 Or in also may realize the abrasive machining by the mill primarily engine bed on. 4. intellectualizations, the work, the flexibility and the integrated 21st century numerical control equipments has certain intellectualized system. In order to pursue the processing efficiency and the processing quality aspect intellectualization, like processing process adaptive control, craft parameter automatic production。 In order to enhance the actuation performance and the use connection aspect intellectualization, like feedforward control, electrical machinery parameter autoadapted operation, automatic diagnosis load automatic designation model, self regulating grade。 Simplification programming, simplification operation aspect intellectualization, like intellectualized automatic programming, intellectualized manmachine contact surface and so on。 Also has the intelligence to diagnose, aspect and so on intelligent monitoring contents, by facilitates the system the diagnosis and the service and so on. The numerical control engine bed the tendency which develops to the fle。数控专业毕业设计外文翻译----中国数控车床的现状和发展趋势分析-数控设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。