20xx上海中考英语词汇与语法冲刺练习14(编辑修改稿)内容摘要:

A. interest B. interesting C. interests D. interested ( )14. Uncle Wang has been here ______ ten years ago. A. for B. since C. in D. at ( )15. The weather was ______ it is today. A. not as wetter as B. not wetter than C. more wetter than D. wetter as ( )16. The little boy was ________with the big boy because he was ____words to him. A. fond, speaking B. angry, saying C. angry, talking D. friendly, telling ( )17. We don39。 t know If it _____. If it_____, we won39。 t go out for a walk. A. rains, will rain B. rains, rains C. will rain, will rain D. will rain, rains ( )18. It39。 s difficult _____your sound because the noise is too high. A. to listen B. to know。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。