数控、机械专业外文翻译资料--高速铣削-数控设计(编辑修改稿)内容摘要:
g, drilling. At the same time a highspeed machine tool spindle system and highspeed feeding system, high stiffness of the main characteristics of highprecision targeting and 5 highprecision interpolation functions, especially highprecision arc interpolation function. Highspeed machining systems of the machine a higher demand, mainly in the following areas: General use of highly flexible highspeed CNC machine tools, machining centers, and some use a dedicated highspeed milling, drilling. At the same time a highspeed machine tool spindle system and highspeed feeding system, high stiffness of the main characteristics of highprecision targeting and highprecision interpolation functions, especially highprecision arc interpolation function. Highspeed machining systems of the machine a higher demand, mainly in the following areas: Highspeed milling machine must have a highspeed spindle, the spindle speed is generally 10000 ~ 100000 m / min, power greater than 15 kW. But also with rapid speed or in designated spots faststopping performance. The main axial space not more than 0 .0 0 0 2 m m. Often using highspeed spindlehydrostatic bearings, air pressurebearing, mixed ceramic bearings, magic bearing structure of the form. Spindle cooling general use within the water or air cooled. Highspeed processing machinedriven system should be able to provide 40 ~ 60 m / min of the feed rate, with good acceleration characteristics, can provide m/s2 to 10 m/s2 acceleration and deceleration. In order to obtain good processing quality, highspeed cutting machines must have a high enough stiffness. Machine bed material used gray iron, can also add a highdamping base of concrete, to prevent cutting tool chatter affect the quality of processing. A highspeed data transfer rate, can automatically increase slowdown. Processing technology to improve the processing and cutting tool life. At present highspeed machine tool manufacturers, usually in the general machine tools on low speed, the feed of the rough and then proceed to heat treatment, the last in the highspeed machine on the halffinished and finished, in improving 6 the accuracy and efficiency at the same time, as far as possible to reduce processing Cost. Highspeed machining tool Highspeed machining tool is the most active one of the important factors, it has a direct impact on the efficiency of processing, manufacturing costs and product processing and accuracy. Tool in highspeed processing to bear high temperature, high pressure, friction, shock and vibration, such as loading, its hardness and wearresistance, strength and toughness, heat resistance, technology and economic performance of the basic highspeed processing performance is the key One of the factors. Highspeed cutting tool technology development speed, the more applications such as diamond (PCD), cubic boron nitride (CBN), ceramic knives, carbide coating, (C) titanium nitride Carbide TIC (N) And so on. CBN has high hardness, abrasion resistance and the extremely good thermal conductivity, and iron group elements between the great inertia, in 1300 ℃ would not have happened significant role in the chemical, also has a good stability. The experiments show that with CBN cutting tool HRC35 ~ 67 hardness of hardened steel can achieve very high speed. Ceramics have good wear resistance and thermal chemical stability, its hardness, toughness below the CBN, can be used for processing hardness of HRC 5 0 parts. Carbide Tool good wear resistance, but the hardness than the lowCBN and ceramics. Coating technology used knives, cutting tools can improve hardness and cutting the rate, for cutting HRC40 ~ 50。数控、机械专业外文翻译资料--高速铣削-数控设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。