数字电路基础知识毕业设计外文翻译(编辑修改稿)内容摘要:

system logic algebra asmathematics foundation, the use binary numeral signal, both can carryon the arithmetic operation and to be able conveniently to carry onthe logic operation (with, or, non, judgement, parison, processingand so on), therefore extremely suits to application and so onoperation, parison, memory, transmission, control, decisionmaking. 2nd, realization simple, the system is reliable By binary system underlie numeral logic circuit, simplereliable, the accuracy is high. 3rd, integration rate high, the function realization is easy Integration rate high, volume small, the power loss is low isone of digital circuit prominent merits. Electric circuit design,service, maintenance nimble convenient, along with the integratedcircuit technology high speed development, the numeral logic circuitintegration rate is more and more high, integrated circuit blockfunction along wi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。